My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:17 PM
Creation date
1/13/2021 7:40:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W.O.# NW1-2338552 <br /> Tanknology Inc. <br /> 11000 N.IvloPac Expressway,Suite 500 Austin,TX 78759 (800)964-0010 Policy 100-29-A <br /> JOB CLEARANCE FORM& Rev:F <br /> Revised:3/05/2018 <br /> SITE SAFETY CHECKLIST—OVF <br /> Site Namef#: Street Address: W.O.# <br /> —( 30-140 c 233Ss�`r <br /> Arrival Time. Departure Time: Travel Time: <br /> Others on site,. Dete <br /> G I o 16).l1'7fi <br /> Scope of Work and Tasks Performed(JSA's must be available for all tasks): <br /> Pd v / <br /> Repairs to <br /> Equipment or fPPa�rtts Provided: r n <br /> Fo]ew-p actions required;equipment isolated;comments: `OP <br /> Q Y as P2 <br /> PPE-PERSONAL PROTECTIVE EQUIP ENT REQUIRED(Check "Hems used or mark—if notapplicable) <br /> Safety Vest 'SrSafety Glasses Gloves Ll Hearing Protection <br /> Steel Toe Boots ❑ Splash Goggles 1 ❑ Hard Hat ❑ Other <br /> ✓ PRE-TEST PROCEDURES (Check ,each item completed or mark -- if not applicable) <br /> 1. 1�- Discuss safety procedures with site personnel. Nearest hospital: <br /> 2. 14' Prier to fuel deliveries the UST system must be placed back into working order. <br /> 3. Secure entire work area with barricades(cones,flags,and extension bars,caution tape,pennant flags,or other perimeter guard). <br /> 4. Place flre extinguishers and"No Smoking'signs in the work area. <br /> 5. Implement LockoutlTagout per API 1646(when accessing product piping during tasks) <br /> 'Secure nodes with"Out of Service"bags and nylon ties. ❑ Secure the circuit breaker(s)with lockout devices and tags. <br /> ❑ Close ball valves or check valves on product piping. ❑ Disconnect electrical"bayonet'connector from the STP(s). <br /> ❑ All applicable equipment disabled during test(s). a Verify LOTO is complete by trying to operate pumps. <br /> SIGN IN - Lead Technician Name Lead Technician Signature <br /> General Safety Checks: <br /> All site personnel have been informed. <br /> Fuel delivery has been informed. Site Representative Name site R sentavve Signature <br /> Is a fuel delivery due today? <br /> LOTO procedures have been discussed and agreed. �Aj q� ' a%kt'Kr, <br /> Work areas barricaded to protect workers,staff&public- I Have discussed job clearance form ith technician. <br /> ✓ POST-TEST PROCEDURES(Check✓each item completed or mark – if not applicable) <br /> 1. ❑ Remove all°Lockout/Tagout"devices. <br /> 2. ❑ Run all pumps and verify there are no leaks: © Impact Valve Test Ports under dispensers <br /> ❑ Leak Detector Threads on STP's ❑ Functional Elements&Relief Screws <br /> 3. ❑ Install lead wire seal on all test plugs&leak detectors that were serviced. <br /> Count LD threads: L1 1-2 L3 L4— LS— L6 <br /> 4. 11Check following components operational: 11ATG probes,sensors,&caps <br /> ❑ Ball floats,dry breaks&caps D Cathodic protection operational <br /> ❑ Containment sumps are dry Ll Dispensers&POS operational <br /> ❑ Dispenser panels are replaced Q Drop tubes,fill adapters&caps <br /> ❑ Leak detectors&vent tubes ❑ Manhole covers and sump lids <br /> r<Monitoring system is operational D Shear valves are open <br /> ❑ Siphon lines and manifold valves ❑ Spill containers&drain valves <br /> ❑ STP fittings and bayonet connectors ❑ Vents(not capped,plugged or isolated) <br /> 5. Remove barricades. <br /> SIGN OUT&Operator Verification of Work(PVF) Lead Technician Name Lead Technician Signature <br /> General Safety Checks: <br /> Work area has been left tidy&safe. <br /> Site staff are aware of work status including any remaining isolation. Site Rftresefttative Name de Repi-pSentative Signature <br /> Changes to equipment are documented and communicated. �(] ! <br /> All incidents,near incidents,and unsafe situations reported. 5 0Lt.Or IA C ASf-d <br /> Site Representative Comments: 1 <br /> COMPANY CONFIDENTIAL ©Tanlmology Tne_,2018.All Rights Reserved. <br /> T rated copies of this document are uncontrolled. The current version is available in the Tatilmolo On-Line Document Controls stem. <br />
The URL can be used to link to this page
Your browser does not support the video tag.