Laserfiche WebLink
7. The equipment must be mounted on a concrete pad with slope of '/4 per foot <br /> minimum. <br /> 8. The shallow end shall be 3'-6" maximum in depth. <br /> 9. All return lines and skimmer lines must be hydraulically balanced. <br /> 10.Sanitary sewer line must be available for backwashing filter. Install a sump so <br /> that during backwashing of the filter, all of the waste will go to sewer. <br /> 11.The lights in the pool shall be protected by a ground-fault circuit interrupter <br /> (GFCI). This will be inspected by the City of Stockton Building Department. <br /> 12. All deck areas must slope '/4"/foot away from the pool. Provide this Department <br /> with information concerning deck drainage. <br /> Any item(s) inadvertently overlooked on the plan check may be cause for reconstruction <br /> at the pool. The EHD requires a pre-gunite inspection, a pre-plaster inspection, and a <br /> final inspection. Prior to continuing work on site, please contact Jeff Carruesco at 209- <br /> 468-3438 to schedule the required inspections. <br /> Sincerely, <br /> Jeff Carruesco, R.E.H.S. <br /> Program Coordinator <br /> Plan Check <br /> 09/06/2007 -2 - <br />