My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1756
>
2300 - Underground Storage Tank Program
>
PR0231300
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2022 4:38:42 PM
Creation date
1/15/2021 11:22:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231300
PE
2361
FACILITY_ID
FA0001858
FACILITY_NAME
MY MINI MART
STREET_NUMBER
1756
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11721005
CURRENT_STATUS
01
SITE_LOCATION
1756 N WILSON WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elite IV Contractors <br /> Date: 04/27/2021 <br /> SRoo83505 (2nd Inspection) <br /> My Mini Mart <br /> 1756 N Wilson Way Stockton, CA 95205 <br /> Inspection Request for 4/30/21 Wednesday @ 9:0o AM <br /> Scope of Work: <br /> Replace the direct -bury 91 spill container and 91 drop tube and shut-off valve <br /> (flapper) on the underground storage tank (UST) system at the above address. <br /> b) Spill Container Test: Verify minimum 5-Gallon capacity and pass a one-hour <br /> hydrostatic test. Proper drainage must also be verified. <br /> c) Overfill Prevention Verification: Measurement of drop tubes to verify 95% <br /> tank volume shut-off. Verification of flapper functionality. <br /> Ensure that all pertinent tank charts and calculations are available for review <br /> at the time of inspection. <br /> d) Since concrete will be broken new the 91 tank, a secondary containment test <br /> must be performed on the 91 tank once concrete is poured in accordance with <br /> the manufacturer's guidelines. <br /> Thank you, <br /> Deborah Jones <br /> Elite IV Contractors <br /> dispatch P eliteiv.com <br /> (209) 461-6337 <br /> Phn: 209.461.6337 Fax: 209.461.6342 2535 Wigwam Dr. Stockton, CA 95205 <br /> Email: dispatch@eliteiv.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.