Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by iāœ“ Manufacturer 0 Industry Standard © Professional Engineer <br /> Test Type © Pressure 17 Vacuum ā‘Q Hydrostatic <br /> Test Equipment Used: <br /> Tank ID 87/91 <br /> Tank Manufacturer Plassteel Inc <br /> Tank Capacity 12000 <br /> Test Start Time 0 Minutes <br /> Initial Reading 2.25 <br /> Test End Time 60 Minutes <br /> Final Reading 2.5 <br /> Change in Reading 0 <br /> Pass/Fail Criteria Pass <br /> Tightness Test Results 0āœ“ Pass 0 Fail 0 Pass Fail 0 Pass Ej Fail © Pass 0 Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by Manufacturer 0 Industry Standard © Professional Engineer <br /> Test Type © Pressure 0 Vacuum © Hydrostatic <br /> Test Equipment Used: <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results © Pass Fail © Pass 0 Fail I ā‘] Pass ID Fail 0 Pass 0 Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results 0 Pass [0 Fail 0 Pass r] Fail I 0 Pass [C] Fail C Pass 0 Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />