Laserfiche WebLink
Underground Storage Tank <br /> Designated UST Operator Visual Inspection Report <br /> Date last <br /> 10 . TESTING AND MAINTENANCE Yes No NA performed <br /> Has monitoring system certification been completed within the past <br /> 9/14/2020 <br /> 12 months? <br /> Has spill container testing been completed within the past ® 9/14/2020 <br /> 12 months? <br /> Has overfill prevention equipment inspection been completed within (� <br /> the past 36 months? I Ili <br /> Has secondary containment testing been completed within the past x ® ri 9/14/2020 <br /> 36 months? <br /> LLJ <br /> Has tank tightness testing been completed within required <br /> timeframes? <br /> Has line tightness testing been completed within the required ® �❑ <br /> timeframes? <br /> Other Test / Maintenance : <br /> Other Test / Maintenance : <br /> Other Test / Maintenance : Annual Training Date ® ® ® 10/14/2020 <br /> 91 . FACILITY EMPLOYEE TRAINING Yes No <br /> 11 Have all individuals performing facility employee duties received the required facility ® ❑ <br /> employee training within the past 12 months? <br /> 13 . COMMENTS <br /> This section may be used to record comments or observations that are not current compliance <br /> deficiencies. <br /> All answers marked "No " must be described by the designated UST operator in Section 3. <br /> Page 4 of 4 <br />