Laserfiche WebLink
I <br /> Underground Storage Tank <br /> Monitoring System Certification Fora <br /> 7. LINE LEAD DETECTOR TESTING <br /> ❑ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br /> Simulated release rate verified: (Check all that apply.) Yes No NA <br /> lr3 GPH ❑ 0.1 GPH ❑ 0.2 GPH <br /> Has the testing apparatus been properly calibrated? ❑ ❑ <br /> For emergency generator tank systems, does the LLD create an audible and visual ❑ ❑ <br /> alarm when a leak is detected? <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a ❑ ❑ <br /> release is detected? <br /> For electronic LLDs, does the turbine automatically shut off when a release is <br /> detected? El El <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the ❑ ❑ <br /> 12/ <br /> monitorin s stem is disabled or disconnected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the ❑ ❑ <br /> monitoring system malfunctions or fails a tightness test? <br /> For electronic LLDs, have all accessible wiring connections been visually inspected ❑ ❑ 0 <br /> for kinks and breaks? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? )�j ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? "o ❑ ❑ <br /> LLD ID LLD Model Lines Monitored Pass Fail <br /> ? ❑ <br /> v t ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> Describe all answers marlfed "No"or"Fail"and proposed remedy in Section 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 4 of 6 <br />