My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
2300 - Underground Storage Tank Program
>
PR0231585
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 11:11:58 AM
Creation date
1/19/2021 8:47:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231585
PE
2361
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
01
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fratklin F��e.u�n5- 0�r)dar Seri -es <br />Maintenance <br />The 708-590 Series Overfill Prevention Valve has no <br />periodic maintenance requirements. <br />However, if the drop tube and valve assembly is removed <br />from the tank (for inspection or service). inspect the <br />drop tube seal for wearldamage (Figure 1E). Replace if <br />necessary. <br />Figure 16: Inspect Gasket <br />Additionally, if the upper or lower drop tube is <br />unthreaded /removed from the OPV, the O-ring(s) should <br />be replaced (Figure 17). <br />Inspect 0 -ring <br />Inspect <br />Figure IT, Inpect O -Rings <br />Inspecting/Verifying 95% Level (Without <br />Removing from Tank) <br />FOR DIMENSIONS "A" & "B": Refer to the "installation <br />record sheet" or re -measure and re -calculate per figure 1. <br />1. Measure Dimension "T' (Figure 18) <br />(Upper drop tube flange to <br />edge of upper tube adapter) <br />2. Verify using the calculation below <br />(Drop tube seal surface to <br />'LAP' <br />i1 bottom of tank) <br />- (Subtract) <br />"B„ (95% Volume from tank chart) <br />- (Subtract) <br />4.5" (114mm) (95% shutoff level offset) <br />_ (Equals) <br />Measure <br />ITS <br />4,/„ <br />z <br />(114 mm) <br />Same value as 'T' <br />indicates correct installation <br />Figure ?8: Dimension Verification After Installation <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.