My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2021 9:43:15 AM
Creation date
1/19/2021 9:28:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Designated UST Operator Visual Inspection Report <br /> 10. TESTING AND MAINTENANCE Yes No NA Date last <br /> performed <br /> Has monitoring system certification been completed within the past <br /> 12 months? 0 El 2/10/20 <br /> Has spill container testing been completed within the past <br /> 12 months? 0 El 2/10/20 <br /> Has overfill prevention equipment inspection been completed within 0 ❑ ❑ 2/10/20 <br /> the past 36 months? <br /> Has secondary containment testing been completed within the past 0 ❑ ❑ 10/6/20 <br /> 36 months? <br /> Has tank tightness testing been completed within required ❑ ❑ ❑ <br /> timeframes? <br /> Has line tightness testing been completed within the required ❑ ❑ 0 <br /> timeframes? <br /> Other Test / Maintenance: ❑ ❑ 0 <br /> Other Test / Maintenance: ❑ ❑ 0 <br /> Other Test / Maintenance: ❑ ❑ 0 <br /> 11. FACILITY EMPLOYEE TRAINING Yes No <br /> Have all individuals performing facility employee duties received the required facility 0 ❑ <br /> employee training within the past 12 months? <br /> 13. COMMENTS <br /> This section may be used to record comments or observations that are not current compliance <br /> deficiencies. <br /> All Functions Normal. <br /> All answers marked "No"must be described by the designated UST operator in Section 3. <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.