Laserfiche WebLink
hrr <br />June 8, 2021 <br />N JOAQUIN Environmental Health Department <br />C O U N T Y Wayne Fox, REHS, Interim Director <br />Greatness grows here. PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Willy Ng, REHS <br />Muniappa Naidu, REHS <br />Michael Kith, REHS <br />Melissa Nissim, REHS <br />Sarah Jablonsky <br />Walton Engineering <br />PO Box 1025 <br />Sacramento, CA 95691 <br />Re: PACIFIC CAR WASH SR0083550 <br />4405 PACIFIC AVENUE, STOCKTON, CA 95207 <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the application for a permit to do the following on the underground storage tank (UST) system at <br />the above noted address: <br />• Remove and install new dispensers with conversion frames <br />• Replace the 87 and 91 turbine sump penetrations <br />• Cold start monitoring panel <br />The permit has been approved with the following conditions: <br />1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br />District for any applicable permits Cl"d requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Provide written notification to ust(a.sigov.org to arrange the following appointments In <br />48-hour notice is required for inspection appointments). <br />a. Verification of the dispenser footprints contained by the under dispenser <br />containment sumps (UDCs). Any potential leaks from piping and fuel filters must <br />drain directly into UDCs. <br />b. Visual inspection of the piping within the dispensers for any leaks <br />c. Sensor functionality: Functionality of the monitoring system must be verified to <br />ensure that monitoring has been restored to meet the requirements of Title 23 <br />California Code of Regulations and the Health & Safety Code. A copy of the <br />alarm history shall be printed prior to performing the "cold start" of the monitoring <br />system and made available at the time of EHD inspection. <br />d. 24-hour hydrostatic test (or equivalent) on the 87 turbine sump and the 91 turbine <br />sump. <br />e. If concrete will be broken near the tanks, piping, or sumps a secondary <br />containment test must be performed on the affected components once concrete <br />is poured in accordance with the manufacturer's guidelines and test results <br />submitted to the EHD within 30 days of testing. <br />1868 E. Hazelton Avenue � Stockton, California 95205 � T 209 468-3420 I F 209 464-0138 � www.sjgov.org/ehd <br />