Laserfiche WebLink
OWNER'S TANK ID O.H. Close Education Generator I OTHER ID I INITIAL SERVICE DATE <br /> Manufacturer: Generac Contents: Diesel Construction Date: Last Repair/Reconstruction Date: <br /> Dimensions: Capacity: 100 gallons Last Change of Product Date: <br /> Design: ❑ UL ❑ SWRI ❑API ❑Other ❑ Unknown <br /> ® Horizontal ❑Vertical ❑ Rectangular <br /> Construction: ❑ Bare Steel ❑Cathodically Protected(Check one:A. ❑ Galvanic or B.❑ Impressed Current)Date Installed: <br /> ❑ Coated Steel ❑Concrete encased steel ❑ Stainless steel ❑Other <br /> ❑ Double-Bottom ❑ Double-Wall ❑ Lined inside;Date lining installed: <br /> Spill control: ❑ Earthen Dike ❑ Steel Dike ❑Concrete CRDM: ®yes ❑ no <br /> ❑ None ❑Other If yes,type:❑ Release Prevention Barrier® Elevated tank ❑ Double bottom tank <br /> Tank elevated on supports ®yes ❑ no ❑ Double wall tank ❑CE-AST ❑other <br /> Support material: ®steel ❑concrete ❑ other <br /> Release Prevention Barrier: ❑yes ® no If yes, Date Installed: AST Category: ®Category 1 ❑ Category 2 ❑ Category 3 <br /> If yes,Type:❑concrete❑synthetic liner ❑clay liner ❑ steel ❑other <br /> OWNER'S TANK ID OH Close Unit 1 I OTHER ID INITIAL SERVICE DATE <br /> Manufacturer: Contents: Diesel Construction Date: Last Repair/Reconstruction Date: <br /> Dimensions: Capacity: 100 gallons Last Change of Product Date: <br /> Design: ❑ UL ❑ SWRI ❑API ❑Other ❑ Unknown <br /> ❑ Horizontal ®Vertical ❑ Rectangular <br /> Construction: ❑ Bare Steel ❑Cathodically Protected(Check one:A. ❑ Galvanic or B.❑ Impressed Current)Date Installed: <br /> ❑ Coated Steel ❑Concrete encased steel ❑ Stainless steel ❑Other <br /> ❑ Double-Bottom ® Double-Wall ❑ Lined inside;Date lining installed: <br /> Spill control: ❑ Earthen Dike ❑ Steel Dike ❑Concrete CRDM: ®yes ❑ no <br /> ❑ None ®Other double wall If yes,type:❑ Release Prevention Barrier® Elevated tank ❑ Double bottom tank <br /> Tank elevated on supports ®yes ❑ no ❑ Double wall tank ❑CE-AST ❑other <br /> Support material: ®steel ❑concrete ❑ other <br /> Release Prevention Barrier: ❑yes ® no If yes, Date Installed: AST Category: ®Category 1 ❑ Category 2 ❑ Category 3 <br /> If yes,Type:❑concrete❑synthetic liner ❑clay liner ❑ steel ❑other <br /> SP001 AST Inspection Standard E-5 <br /> COPYRIGHT©2018 Steel Tank Institute <br />