Laserfiche WebLink
Appe- Iix F-2 <br /> Is the primary tank free of water or has another preventative measure been taken? <br /> 4 NOTE: Refer to paragraphs 6.10 and 6.11 of the standard for alternatives for Category 1 o Yes ❑ No N/A <br /> tanks.N/A is only appropriate for these alternatives. <br /> 5 For double-wall or double bottom tanks or CE-ASTs, is interstitial monitoring equipment ❑ Yes ❑ NO N/A <br /> (where applicable)in good working condition? <br /> 6 For double-wall tanks or double bottom tanks or CE-ASTs,is interstice free of liquid? ii Yes ❑ NO N/A <br /> Remove the liquid if it is found. If tank product is found,investigate possible leak. <br /> Equipment on tank <br /> 7 If overfill equipment has a"test'button,does it activate the audible horn or light ❑ Yes ❑ NO ❑ /A <br /> to confirm operation? If battery operated, replace battery if needed. <br /> 8 Is overfill prevention equipment in good working condition?If it is equipped with a ii Yes ❑ NO N/A <br /> mechanical test mechanism,actuate the mechanism to confirm operation. <br /> 9 Is the spill container(spill bucket)empty,free of visible leaks and in good working <br /> condition? ❑ Yes ❑ NO N/A <br /> 10 Are piping connections to the tank(valves,fittings,pumps,etc.)free of visible leaks? YeS ❑ NO <br /> Note if"No" identify location and describe leak. <br /> 11 Do the ladders/platforms/walkways appear to be secure with no sign of severe corrosion <br /> or damage? Yes ❑ NO ❑ N/A <br /> Containment(Diking/Impounding) <br /> 12 Is the containment free of excess liquid,debris,cracks,corrosion,erosion,firehazards and <br /> other integrity issues? Yes ❑ No ci N/A <br /> 13 Are dike drain valves closed and in good working condition? o Yes ❑ No N/A <br /> 14 Are containment egress pathways clear and any gates/doors operable? ❑ Yes ❑ No N/A <br /> Concrete Exterior AST(CE-AST) <br /> 15 Inspect all sides for cracks in concrete. Are there any cracks in the concrete exterior larger <br /> than 1/16"? ❑Yes o NO ❑IJV/A <br /> 16 Inspect concrete exterior body of the tank for cleanliness, need of coating,or rusting where ❑ Yes E3 NO N/A <br /> applicable. Tank exterior in acceptable condition? <br /> Visual inspect all tank top openings including nipples, manways,tank top overfill containers, <br /> 17 and leak detection tubes. Is the sealant between all tank top openings and concrete intact ❑ Yes ❑ No N/A <br /> and in good condition? <br /> Other Conditions <br /> 18 Is the system free of any other conditions that need to be addressed for Yes ❑ NO <br /> continued safe operation? <br /> Monthly Checklist Page 2 of 3 <br />