Laserfiche WebLink
FORMAL EXTERNAL TANK INSPECTION <br /> California Department of Corrections and Rehabilitation—Stockton Facility <br /> Tank 2 <br /> Inspected: September 9, 2021 <br /> P <br /> r 4 <br /> N <br /> Photo 5: Top view of the Tank facing west. Secondary emergency vent in foreground and <br /> operational pressure/vacuum vent on a 2-inch riser pipe, liquid level gauge, and primary <br /> emergency vent. <br /> 5 <br /> II y <br /> ` � b <br /> Photo 6: Evidence of a leaking dispenser pump. Repairs by tank contractor in progress,not <br /> yet complete. <br /> �i� *k�- <br /> CONDOR <br />