My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NEWCASTLE
>
7650
>
2800 - Aboveground Petroleum Storage Program
>
PR0527758
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 3:29:08 PM
Creation date
1/19/2021 3:56:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0527758
PE
2832 - AST FAC 10 K - </=100 K GAL CUMULATIVE
FACILITY_ID
FA0003938
FACILITY_NAME
CDCR-NORTHERN CALIFORNIA YOUTH CORRECTIONAL CENTER
STREET_NUMBER
7650
Direction
S
STREET_NAME
NEWCASTLE
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
18115002
CURRENT_STATUS
Inactive, non-billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
7650 S NEWCASTLE RD STOCKTON 95215
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Prevention,Control and Countermeasure Plan <br /> For Northern California Youth Correctional Facility <br /> APPENDIX 1-1 <br /> COMPLIANCE INSPECTION PLAN REVIEW AND CHANGE LOG <br /> In accordance with 40 CFR 112.5(b) a review and evaluation of this Spill Prevention Control and Countermeasure <br /> (SPCC) Plan will be completed every five years at a minimum. It will be amended to include more effective and <br /> proven prevention and control technologies if these technologies significantly reduce the likelihood of discharge <br /> of oil from the facility.Amendments to this plan will be completed within six months of completing the review <br /> and evaluation. <br /> The plan shall also be amended whenever there is a "change if facility design, construction, operation or <br /> maintenance which materially affects the facility's potential for the discharge of oil into or upon the navigable <br /> waters of the United States or adjoining shorelines" 40 CFR 112.5 (a). Amendments to the plan shall be completed <br /> and implemented within six months of the facility changes. <br /> Any amendments to the SPCC Plan (increase or decrease of petroleum, construction, operation, or maintenance <br /> that materially affects the potential for a discharge of petroleum at the facility)shall be certified by a registered <br /> professional engineer, in accordance with 40 CFR 112.3(d). Non-technical revisions such as personnel changes or <br /> telephone numbers may be made by the facility and recorded in the log. <br /> Plan Review Certification:The undersigned attest that I have completed review and evaluation of the SPCC Plan <br /> for Northern California Youth Correctional Center (date) and will (will not) amend the Plan as a This log is provided <br /> for use in documenting updates of the SPCC plan. <br /> Date Will Not Sections Amended Signature Title <br /> Amend <br /> I-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.