My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NEWCASTLE
>
7650
>
2800 - Aboveground Petroleum Storage Program
>
PR0527758
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 3:29:08 PM
Creation date
1/19/2021 3:56:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0527758
PE
2832 - AST FAC 10 K - </=100 K GAL CUMULATIVE
FACILITY_ID
FA0003938
FACILITY_NAME
CDCR-NORTHERN CALIFORNIA YOUTH CORRECTIONAL CENTER
STREET_NUMBER
7650
Direction
S
STREET_NAME
NEWCASTLE
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
18115002
CURRENT_STATUS
Inactive, non-billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
7650 S NEWCASTLE RD STOCKTON 95215
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Prevention, Control and Countermeasure Plan <br /> For Northern California Youth Correctional Center <br /> Table C-3. (Continued) <br /> Potential Release <br /> Contents/ Volume <br /> Tank Location Capacity Activity/ (gallons)/Rate of Secondary <br /> and Purpose (gallons) Tank Type Cause of Release Release Containment Direction of Flow Possible Spill Pathway <br /> Used Oil Storage Used Oil Steel tank in Tank Failure 400 Single wall tank in Secondary Containment To storm drain pump <br /> Area 400 gal secondary Secondary will be able to contain station <br /> containment Gradual to containment oil. <br /> Covered with tarp Instantaneous <br /> Active containment Onto gravel surface if <br /> Transfer and/or Transport 27 Active containment drum is damaged <br /> of drums to used oil tank, outside of containment <br /> damage to drum or vehicle Gradual to area <br /> accident Instantaneous <br /> Transfer to commercial 400 Secondary <br /> waste disposal vehicle; containment berm <br /> damage to pump hose Gradual Active containment <br /> Auto Shop New Motor Oil Steel Drums.In Transfer of drums into and 55 Spill pallet Most material is To storm drain pump <br /> Garage/Storage 12 x 55 Shed or out of garage,damage to containment expected to pool on the station <br /> Area Transmission maintenance bay drum Gradual to garage floor and remain <br /> Oil concrete floor on Instantaneous Active containment within the building. <br /> 2 x 55 spill containment Dispensing of product in 55 <br /> pallets. garage In Shed onto gravel <br /> Gradual surface if drum is <br /> damaged outside of <br /> containment area <br /> Vehicle Diesel Portable Refueling Tank Failure during storage 100 None Onto pavement or Unlikely to flow to surface <br /> Maintenance 100 Tank.Active Gradual to surrounding dirt water <br /> Garage containment when Instantaneous depending where <br /> in use. Transfer while filling Up to 2,000 Active containment refueling occur. <br /> refueler at vehicle fueling Diesel tank at <br /> station vehicle fueling <br /> station <br /> Failure of tank truck or <br /> hose,or overfilling tank Gradual <br /> Transfer to AST 100 Active containment <br /> Failure of tank truck or Gradual <br /> hose,or overfilling tank <br /> Tank failure due to 100 None <br /> accident during transport Gradual to <br /> Instantaneous <br /> C-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.