Laserfiche WebLink
Cross-Reference Table(Continued) <br /> Section of 40 CFR 112 Requirement Location in NCYCC SPCC Plan <br /> 40 CFR 112.7(i) Brittle Fracture Evaluation Not Applicable <br /> 40 CFR 112.7(j) Conformance with State Rules, Regulations, Section 8.2 <br /> and Guidelines <br /> 40 CFR 112.8(b) Facility Drainage Section 5.4 <br /> 40 CFR 112.8(c) Bulk Storage Containers Sections 5.1, 5.2 and 6 <br /> Tables 1, 2, C-1 and C-2 <br /> 40 CFR 112.8(c)(1) Bulk storage containers are compatible with Section 6.3 <br /> material stored <br /> 40 CFR 112.8(c)(2)(i) Bulk storage containers have appropriate Sections 5.1, 5.2 and 6 <br /> secondary containment Tables 1, 2, C-1 and C-2 <br /> 40 CFR 112.8(c)(3) Requirements for drainage of diked areas Section 6.5 <br /> 40 CFR 112.8(c)(6) Inspections and integrity testing for Sections 6.7 and 10.2 <br /> aboveground containers <br /> 40 CFR 112.8(c)(8)(i) Liquid Level Sensors Section 6.8,Tables C-1 <br /> 40 CFR 112.8(c)(10) Correct visible discharges Section 6.9,8 <br /> 40 CFR 112.8(c)(11) Locate mobile containers in secondary Section 2.3 <br /> containment <br /> 40 CFR 112.8(d) Facility Transfer Operations, Pumping,and Sections 6, 7 and Table C-1 <br /> Facility Process Piping <br /> 40 CFR 112.20(e) Certification of Substantial Harm Criteria Section 3 <br /> Notes: <br /> NCYCC does not use a tank car and tank truck loading and unloading rack. However,the provisions for preventing discharge during <br /> petroleum unloading. <br /> CFR = Code of Federal Regulations <br /> NCYCC = Northern California Youth Correction Center <br /> SPCC = spill prevention,control,and countermeasure <br /> A-2 <br />