Laserfiche WebLink
H & H ENGINEERING CONSTRUCTION 4-4204-0010317 Page 2 of 4 <br /> Date CodeDescription Reference Rate Quanti Amount <br /> 12/21 (1 ENVIRONMENTAL FEE 1 SC1057982 18.00 1.00 18.00 <br /> -18.00/Ticket ENVIRONMENTAL FEE 11 <br /> 12/21 11 FUEL RECOVERY FEE SC1057983 32.47 1.00 32.47 <br /> (5.20%/Ticket)FUEL RECOVERY FEE <br /> N 12/22 VS SW-TIMBERRREATED/OLD Y81521927 67.73 13,19 TN 893,36 <br /> v 12/22 VS Reference:6146660 <br /> 10 <br /> 12/22 VS Vehicle:DCC 3357 ,DCC 40YD <br /> 12/22 VS Contract:4204122008 <br /> 12/22 VS Generator Name:H&H ENGINEERING <br /> 12/22 11 ENVIRONMENTAL FEE 1 SC1058260 18.00 1.00 18.00 <br /> -18.00/Ticket ENVIRONMENTAL FEE 11 <br /> 12/22 )l FUELRECOVERYFEE SC1058261 46.45 1.00 46.45 <br /> (5.20%/Ticket)FUEL RECOVERY FEE <br /> P <br /> N 12/24 VS SW-TIMBERrfREATED/OLD Y81522644 67.73 9.34 TN 632,60 <br /> 12/24 VS Reference:6146661 <br /> 12/24 VS Vehicle:DCC 3353 ,DCC 40YD <br /> 12/24 VS Contract:4204122008 <br /> 12/24 VS Generator Name:H&H ENGINEERING <br /> 12/24 (1 ENVIRONMENTAL FEE 1 SC1059225 18.00 1.00 18.00 <br /> -18.00/Ticket ENVIRONMENTAL FEE 11 <br /> 12/24 )l FUELRECOVERYFEE SC1059226 32.90 1.00 32.90 <br /> (5.20%/Ticket)FUEL RECOVERY FEE <br /> 12/28 VS SW-TIMBER/TREATED/OLD Y81523046 67.73 10.66 TN 722.00 <br /> 12/28 VS Reference: 1000017 <br /> 12/28 VS Vehicle:HJELM J15 <br /> 12/28 VS Contract:4204122008 <br /> 12/28 VS Generator Name: H&H ENGINEERING <br /> 12/28 fl ENVIRONMENTAL FEE 1 S01059833 18.00 1.00 18.00 <br /> -18.00/Ticket ENVIRONMENTAL FEE 11 <br /> 12/28 )l FUELRECOVERYFEE SC1059834 37.54 1,00 37.54 <br /> (5.20%/Ticket)FUEL RECOVERY FEE <br /> 12/30 VS SW-TIMBER/TREATED/OLD Y81523919 67,73 3.52 TN 238.41 <br /> IF ANY OF THE FOLLOWING HAS CHANGED SINCE YOUR LAST STATEMENT, PLEASE INDICATE.... <br /> Your Name <br /> Street _ Home Phone <br /> City State Zip <br /> Other Information <br />