Laserfiche WebLink
• <br /> Thornton On-site Waste Water Feasibility Study Page 9 of 9 <br /> Our Project Number: 2017-00010 <br /> December 1, 2017 <br /> 6.0 LIMITATIONS <br /> The recommendations of this report are based on the information provided regarding the <br /> proposed construction as well as information provided by others (SJC EHD). No onsite <br /> testing has been performed as part of this preliminary septic review. Onsite testing is <br /> required to develop a design t at is appropriate f®rt site nd confirm preliminary <br /> findings. In the absence of onsite confirmation testing (which includes soil borings and <br /> percolation testing), exact system sizing and usability cannot be definitely confirmed. <br /> Our professional services were performed, our findings obtained, and our <br /> recommendations proposed in accordance with generally accepted engineering principles <br /> and practices. This warranty is in lieu of all other warranties either expressed or implied. <br /> Test findings and statements of professional opinion do not constitute a guarantee or <br /> warranty, expressed or implied. If you have-any questions, please do not hesitate to call. <br /> ySjnNAt <br /> Sincerely, <br /> Petra/ogix Engineering Inc. C. ' "''''"''' `•' N <br /> b <br /> Daniel E. Kramer, Project Geologist <br /> Professional Geologist #8657 <br /> Petralc:_lix Enameering,Inc <br /> 26S7S RruBila P.cad,GeIt.Ca 95e>32 <br /> 12C'>�-ACO- 729 <br /> www.petrologix,com <br />