Laserfiche WebLink
4 buildings and utilities shall be constructed to mitigate the effects of differential settlement. All utility connections <br />0 0 <br />() g g tY <br />shall be designed with flexible connections and utility collars; <br />(5) utilities shall not be installed in or below any low permeability layer of final cover; <br />(6) pilings shall not be installed in or through any bottom liner unless approved by the RWQCB; <br />(7) if pilings are installed in or through the low permeability layer of final cover, then the low permeability layer must be <br />replaced or repaired; and <br />(8) periodic methane gas monitoring shall be conducted inside all buildings and underground utilities in accordance with <br />section 20933 of Article 6, of Subchapter 4 of this Chapter. <br />(f) The EA may require that an additional soil layer or building pad be placed on the final cover prior to construction to <br />protect the integrity and function of the various layers of final cover. <br />(g) All on site construction within 1,000 feet of the boundary of any disposal area shall be designed and constructed in <br />accordance with the following, or in accordance with an equivalent design which will prevent gas migration into the <br />building, unless an exemption has been issued: <br />(1) a geomembrane or equivalent system with low permeability to landfill gas shall be installed between the concrete <br />floor slab of the building and subgrade; <br />(2) a permeable layer of open graded material of clean aggregate with a minimum thickness of 12 inches shall be <br />installed between the geomembrane and the subgrade or slab; <br />(3) a geotextile filter shall be utilized to prevent the introduction of fines into the permeable layer; <br />(4) perforated venting pipes shall be installed within the permeable layer, and shall be designed to operate without <br />clogging; <br />(5) the venting pipe shall be constructed with the ability to be connected to an induced draft exhaust system; <br />(6) automatic methane gas sensors shall be installed within the permeable gas layer, and inside the building to trigger an <br />audible alarm when methane gas concentrations are detected; and <br />(7) periodic methane gas monitoring shall be conducted inside all buildings and underground utilities in accordance <br />with Article 6, of Subchapter 4 of this chapter (section 20920 et seq.). <br />