My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
CORRESPONDENCE_2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 11:43:14 AM
Creation date
1/21/2021 4:05:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2017
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br /> Brusca File No. 137-002 August 10,2017 <br /> Murphy Parkway Property Soil Gas Monitoring Workplan <br /> residual wastes at the site, and was conducted with regulatory agency oversight. AGE's work <br /> included the performance of a significant number of test pits within the capped area, as well as <br /> onsite areas extending to the south and east of the cap. Additionally, AGE conducted a <br /> geophysical survey (involving ground penetrating radar and a magnetometer survey) on the <br /> westerly portion of the property to identify any unknown areas of disturbed materials/buried <br /> wastes. The geophysical work reportedly identified two areas (approximate 2,000 square feet <br /> each in plan area) of deeper disturbed materials/wastes along the far westerly margin of the <br /> property (see Plate 2). Subsequent excavation in these two areas revealed wastes extending to <br /> depths on the order of eight feet to 13 feet. The wastes encountered in these two areas reportedly <br /> consisted of glass, metal parts (such as vehicle window frame components) and minor plastics. <br /> AGE's work included the remedial excavation/removal of the buried wastes (approximately <br /> 2,200 cubic yards) from these areas for offsite disposal at a Class II landfill; the remedially- <br /> excavated areas subsequently were backfilled with imported soil. It is reported that wastes <br /> exposed in the westerly walls of the remedial excavations were left in place at the westerly <br /> property line; as such, it is indicated that subsurface wastes likely remain offsite beneath the <br /> westerly adjoining property(former cogeneration plant at 17200 Murphy Parkway). <br /> AGE's investigative work included the collection of a substantial number of samples of soil and <br /> waste materials for analytical laboratory testing. It is reported that the laboratory testing did not <br /> reveal significant chemical contaminant concerns associated with residual wastes at the site. In <br /> general, the residual waste materials (indicated to primarily consist of broken glass fragments) <br /> were determined to be inert and innocuous, and further investigative or remedial work was not <br /> recommended. <br /> As a part of their investigative work, AGE installed a soil gas monitoring well with the cap area <br /> on the property (see Plate 2). Sampling of this well reportedly has not revealed methane in soil <br /> gas at levels that would be a concern; the SJCEHD has indicated that the existing soil gas <br /> monitoring well can be abandoned in conjunction with the planned new monitoring well <br /> installation work. <br /> PROPOSED SITE DEVELOPMENT/CONSTRUCTION <br /> Redevelopment of the subject property is planned to be initiated later this year. The planned <br /> development includes construction of an approximate 870,000 square-foot commercial/light- <br /> industrial structure intended for use for warehouse/distribution purposes. The general location of <br /> the planned building is shown on Plate 2. The planned structure will be of tilt-up concrete <br /> construction with a concrete slab-on-grade floor. Onsite areas exterior to the building will <br /> support asphaltic-concrete and/or concrete pavements and very limited landscaping. Storm water <br /> basins are planned on the far northwesterly and southwesterly portions of the site. <br /> Project earthwork construction/grading will involve the disturbance, redistribution, and grading <br /> of soils across essentially the entire 48-acre parcel, including the capped area on the <br /> northwesterly portion of the site. The project specifications call for the complete excavation of <br /> loose soils/fill materials (including remnant buried glass waste)to expose underlying firm, native <br /> undisturbed soils. In some areas, the depth of required excavation to remove fills/wastes could <br /> be several feet or more. The excavated soils (and mixed-in glass materials) will be moisture <br />
The URL can be used to link to this page
Your browser does not support the video tag.