Laserfiche WebLink
Day of Week: Monday Tuesday I Wednesday I Thursday Friday Saturday Sunday <br /> Date: I •2.26 -3- o I U-4-Zo I U-5-2a I <br /> Operator Initials: -w— JJ <br /> EPA Method 22: Location Sth Level of Boiler Structure. <br /> Permit ID N-645-37-0: Biomass fuel handling operation with metering bin,Reclaim conveors,and other associated conveyors. <br /> Condition 5: Permittee shall not cause or allow visible emissions from conveyor transport points. <br /> 1.)Perform a daily check for visible dust emissions for each tranfer point before noon. <br /> 2.)Make sure sun location is at your back while observing. <br /> Instructions: 3.)Observe the transfer Point for atleast 2 minute,and look for visible dsust missions. <br /> 4.)Mark"N"for no emissions,"Y"for visible emissions,and"NA"if the process is not running. <br /> 5.)If visible emissions are observed,Start a stop watch.If visible emissions are not rectified within 1 hour <br /> A Method 9 observation must be conducted. <br /> Boiler Structure: Box 1.)Visible emissions(Y/N). Box 2.)Time of Day(rime). <br /> Boller Structure; Monday Tuesday Wednesday Thursday Friday Saturday Sunday <br /> TranserringFrom: Transferring to: Y/N Time Y/N Time Y/N Time Y/N Time Y/N Time Y/N Time Y/N Time <br /> Conveyor"E" Conveyor"F" )O it CKfZ6 loos v1 loco i4l I <br /> Overfeed Screw Conveyor"G" N /( 60 n oC(25 100SI 4 t A 1010 <br /> Conveyor"G" Conveyor"F" 89(20 n 10930 tex 0 laze, I O L5 <br /> Conveyor"F" Boiler drag Chain A7 >gz 5 ri t.,s 1 6 [U 1o2D <br /> octz <br /> South Fuel Yard Ground o-m 1'p25 u D <br /> Fly Ash Silos, Visible Dust? /t/ ocr-�5 n IoL5 A I o3 <br /> Hazardous Waste Above ground Storage Tank Inspection Maintain Daily Inspections For Three Years/Req: 22CCR s66265.195 <br /> Day of Week: Monday Tuesday Wednesday Thursday Friday Saturday Sunday <br /> Date: -2 2(3 1(-3-20 11-4-26 11-5-9(p 11-G-zo ik-T-Zo 1143-Zo <br /> Inspectors initials: �(Qz U <br /> 1)Are all overfill/spill control equipment,waste <br /> cutoff systems,bypass and drainage systems in <br /> good working order? (If applicable) <br /> 2)Are all above ground portions of the tank J <br /> free of corrosion or realease of any waste? Ile.I T Il T t 1 <br /> 3)Is there indication of release of any waste? 4 ✓( <br /> 4)Any flyash escaping from silos or loading area? v- <br /> 5) <br /> 5)Record Ash,Trona Silo Baghouse DP Readings first week of each Month:Trona #2= #2= Date: <br /> Tank must be marked USED OIL-HAZERDOUS WASTE and have an accumulation start date. <br /> Comments: Note:In the time column put TIME OF DAY. <br /> Page 7 <br />