Laserfiche WebLink
Day of Week: Monday I Tuesday I Wednesday I Thursday Friday Satruday*4ft <br /> Date: +3-� -11> - -lac-20 -20 - <br /> Operator Initials: �7�fl2 C <br /> EPA Method 22: Location Sth Level of Boiler Structure. <br /> Permit ID N-645-37-0: Biomass fuel handling operation with metering bin,Reclaim conveors,and other associated conveyors. <br /> Condition 5: Permittee shall not cause or allow visible emissions from conveyor transport points. <br /> 1.)Perform a daily check for visible dust emissions for each tranfer point before noon. <br /> 2.)Make sure sun location is at your back while observing. <br /> Instructions: 3.)Observe the transfer Point for atleast 1 minute,and look for visible dsust missions. <br /> 4.)Mark"N"for no emissions,"Y"for visible emissions,and"NA"if the process is not running. <br /> 5.)If visible emissions are observed,Start a stop watch.If visible emissions are not rectified within 1 hour <br /> A Method 9 observation must be conducted. <br /> Boiler Structure: Box 1.)Visible emissions(Y/N). Box 2.)Time of Day(Time). <br /> Boiler Structure: Monday Tuesday Wednesday Thursday Friday Saturday Sunday <br /> Transerring From: Transferring to: Y/N Time Y/N Time Y/N Time Y/N Time Y/N Time Y/N Time Y/N Time <br /> Conveyor"E" Conveyor"F" q$p (V <br /> Overfeed Screw Conveyor"G" D6s�- <br /> Conveyor"G" Conveyor"F" 4o N p D <br /> Conveyor"F" Boiler drag Chain crus \ 0 10 <br /> South Fuel Yard Ground p50 (V q60 <br /> Q� <br /> Fly Ash Silos, Visible Dust? 'kS 0915 T 7 <br /> Hazardous Waste Above ground Storage Tank Inspection Maintain Daily Inspections For Three Years/Req: 22CCR s(36265.195 <br /> Day of Week: Monday Tuesday Wednesday Thursday Friday Saturday Sunday <br /> Date: 5-14-Lo a- - -2 X <br /> Inspectors initials: <br /> 1)Are all overfill/spill control equipment,waste <br /> cutoff systems,bypass and drainage systems in <br /> good working order? (If applicable) 1 7 <br /> 2)Are all above ground portions of the tank V <br /> free of corrosion or realease of any waste? y J / <br /> 3)Is there indication of release of any waste? fv <br /> 4)Any flyash escaping from silos or loading area? !\ <br /> S)Record Ash,Trona Silo Baghouse DP Readings first week of each Month:Trona #1= #2= Date: - <br /> Tank must be marked USED OIL-HAZERDOUS WASTE and have an accumulation start date. <br /> Comments: Note:In the time column put TIME OF DAY. <br /> Page 7 <br />