Laserfiche WebLink
J.M. Equipment Co.Inc.,Facility(11754), Used Oil Tank, 22§CCR 66265.192&STI-SP0011 November 2019 <br /> Table of Contents <br /> 1.0 Introduction............................................................................................................................... 1 <br /> 1.1 Purpose:................................................................................................................................. 1 <br /> 2.0 References.................................................................................................................................2 <br /> 2.1 Code of Federal Regulations (CFR): ....................................................................................2 <br /> 2.2 Steel Tank Institute (STI): ....................................................................................................2 <br /> 2.3 American Petroleum Institute (API):....................................................................................2 <br /> 2.4 American Society of Mechanical Engineers (ASME)..........................................................2 <br /> 2.5 National Association of Corrosion Engineers (NACE):....................................................... 2 <br /> 2.6 National Fire Protection Association(NFPA):..................................................................... 2 <br /> 2.7 Underwriters Laboratories, Inc. (UL):.................................................................................. 2 <br /> 2.8 American Society of Nondestructive Testing (ASNT):........................................................ 2 <br /> 2.9 California Health and Safety Code (HSC):........................................................................... 2 <br /> 2.10 California Code of Regulations (CCR):.............................................................................. 2 <br /> 3.0 Description................................................................................................................................ 3 <br /> 3.1 Job Description: .................................................................................................................... 3 <br /> 3.2 Tank Description:.................................................................................................................. 3 <br /> 3.3 Tank Classification: .............................................................................................................. 3 <br /> 3.4 Service Description:.............................................................................................................. 3 <br /> 3.5 Part Description: ................................................................................................................... 3 <br /> 3.6 Joint Type Description:.........................................................................................................4 <br /> 3.7 Inspection Description:.........................................................................................................4 <br /> 3.8 Equipment Description: ........................................................................................................ 4 <br /> 4.0 Inspection.................................................................................................................................. 5 <br /> 4.1 Results:.................................................................................................................................. 5 <br /> 4.1.1 Foundation: .................................................................................................................... 5 <br /> 4.1.2 Containment:.................................................................................................................. 5 <br /> 4.1.3 Shell: .............................................................................................................................. 5 <br /> 4.1.4 Heads.............................................................................................................................. 5 <br /> 4.1. Appurtenances: ................................................................................................................ 5 <br /> 4.1.6 Painting/Insulation:........................................................................................................ 5 <br /> 4.1.7 Piping:............................................................................................................................ 6 <br /> 4.1.8 Stairways/Ladders/Walkways:....................................................................................... 6 <br /> iv <br />