My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
2300 - Underground Storage Tank Program
>
PR0231554
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 11:20:06 AM
Creation date
1/25/2021 3:07:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231554
PE
2361
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form SR0082635 <br /> 6 . TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by Manufacturer Industry Standard Professional Engineer <br /> Test Type Pressure ® Vacuum ® Hydrostatic <br /> Test Equipment Used . <br /> Tank ID <br /> Tank Manufacturer <br /> Tank Capacity <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results El Pass El Fail 10 Pass Fail Pass r Fail Pass Fail <br /> 7 . PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by Manufacturer ® Industry Standard Professional Engineer <br /> Test Type ® Pressure ® Vacuum Ej Hydrostatic <br /> j Test Equipment Used : Pressure Gauge <br /> E <br /> Pipe Run ID 87 <br /> Pipe Manufacturer <br /> Test Start Time 0 min <br /> Initial Reading 5 psi <br /> Test End Time 60 min <br /> Final Reading 5 psi <br /> Change in Reading 0 <br /> Pass/Fail Criteria Pass <br /> Tightness Test Results ® Pass ® Fail Pass ® Fail © Pass 0 Fail Pass Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ( Pass Fail Pass ® Fail Pass Fail [r Pass E] Fail11 <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail' and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section . <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.