Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by © Manufacturer ❑Q Industry Standard El Professional Engineer <br /> Test Type © Pressure Q Vacuum E Hydrostatic <br /> Test Equipment Used: <br /> Sump/UDC ID # 11 /#12 #13 #14 SAT <br /> Sump Manufacturer Bravo Bravo Bravo Bravo <br /> Sump Depth (inches) 24 24 24 24 <br /> Sump Bottom to Top of 18 18 18 18 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 00 min 00 mins 00 mins 00 mins <br /> Initial Reading 18 18 18 18 <br /> Test End Time 60 mins 60 mins 60 mins 60 mins <br /> Final Reading 18 18 18 18 <br /> Change in Reading 0 0 0 0 <br /> Pass Fail Criteria PASS PASS PASS PASS <br /> Tightness Test Results © Pass © Fail E✓ Pass r] Fail 0✓ Pass 0 Fail © Pass ❑� Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass Fail Criteria <br /> Tightness Test Results Pass 0 Fail 0 Pass Fail Pass © Fail C Pass C Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3of5 <br />