Laserfiche WebLink
SR0083263 34243 Crisman Rd. 3rd Inspection 9/01/2021 <br /> Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ® Manufacturer El Industry Standard Professional Engineer <br /> Test Type Pressure ® Vacuum ® Hydrostatic <br /> Test Equipment Used: <br /> Tank ID <br /> Tank Manufacturer <br /> Tank Capacity <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ® Pass rj Fail Pass ® Fail Pass Ej Fail r] Pass ® Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by El Manufacturer ® Industry Standard ® Professional Engineer <br /> Test Type ® Pressure Vacuum Ej Hydrostatic <br /> Test Equipment Used: <br /> Pipe Run ID Diesel <br /> Pipe Manufacturer <br /> Test Start Time 10:00 <br /> Initial Reading 100 inches <br /> Test End Time 11:00 <br /> Final Reading 100 inches <br /> Change in Reading 0 min <br /> Pass/Fail Criteria PASS <br /> Tightness Test Results ® Pass M Fail ® Pass ® Fail ® Pass r] Fail rl Pass r] Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ® Pass ® Fail rj Pass ® Fail ® Pass El Fail j ® Pass ® Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />