Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />SECONDARY CONTAINMENT TESTING REPORT FORM (Page 1 of 6) <br />Type of Action ❑ Installation Test ❑ Repair Test ❑ Six Month Test 9 36 Month Test <br />CERS = California Environmental Reporting System, ID =Identification, UST =Underground Storage Tank, ICC = International Code Council, NA= NotApplicable, UDC = Under - <br />Dispenser Containment <br />1. <br />FACILITY INFORMATION <br />CERS ID <br />10182251 <br />Date of Secondary Containment Test <br />6/10/2020 <br />Business Name (Same as Facility Name or DBA -Doing <br />Arch Arco AmPm <br />Business As) <br />Business Site Address <br />4855 South Hwy 99 East Frontage <br />Road <br />City <br />Stockton <br />ZIP Code <br />95215 <br />II. UNDERGROUND <br />STORAGE TANK SERVICE TECHNICIAN INFORMATION <br />Name of UST Service Technician Performing the <br />Benjamin Duncan <br />Test (Print as shown on the ICC Certification) <br />Phone # <br />(707) 621-0378 <br />Contractor / Tank Tester License # <br />Tank Tester License #90-1120 <br />ICC Certification # <br />5246802 -UT <br />ICC Certification Expiration Date <br />3/21/2021 <br />111. SUMMARY OF SECONDARY CONTAINMENT TESTING <br />HP wqpw <br />RESULTS <br />TANK ID: (By tank number, stored product, etc) <br />A <br />T -1 -Regular 87 <br />B T -2 -Plus 89 <br />C T -3 -Super 91 <br />D <br />Tank Containment <br />Tightness Test Result <br />O <br />Pass ❑ Fail ❑ NA <br />E Pass ❑ Fail ❑ NA <br />E Pass <br />❑ Fail ❑ NA <br />❑ Pass <br />❑ <br />Fail ❑ NA <br />Product Piping Containment <br />Tightness Test Result <br />E <br />Pass ❑ Fail ❑ NA <br />O Pass ❑ Fail ❑ NA <br />Pass <br />❑ Fail ❑ NA <br />❑ Pass <br />❑ <br />Fail ❑ NA <br />Communication Test Result <br />E <br />Pass ❑ Fail ❑ NA <br />R Pass ❑ Fail ❑ NA <br />E Pass <br />❑ Fail ❑ NA <br />❑ Pass <br />❑ <br />Fail ❑ NA <br />Remote Fill Piping Containment <br />Tightness Test Result <br />❑ <br />Pass ❑ Fail O NA <br />❑ Pass ❑ Fail O NA <br />❑ Pass <br />❑ Fail E NA <br />❑ Pass <br />❑ <br />Fail ❑ NA <br />Communication Test Result <br />❑ <br />Pass ❑ Fail E NA <br />❑ Pass ❑ Fail R NA <br />❑ Pass <br />❑ Fail R NA <br />❑ Pass <br />❑ <br />Fail ❑ NA <br />Vent Piping Containment <br />Tightness Test Result <br />❑ <br />Pass ❑ Fail E NA <br />❑ Pass ❑ Fail E NA <br />❑ Pass <br />❑ Fail E NA <br />❑ Pass <br />❑ <br />Fail ❑ NA <br />Communication Test Result <br />❑ <br />Pass ❑ Fail E NA <br />❑ Pass ❑ Fail E NA <br />❑ Pass <br />❑ Fail E NA <br />❑ Pass <br />❑ <br />Fail ❑ NA <br />Vapor Recovery Piping Containment <br />Tightness Test Result <br />❑ <br />Pass ❑ Fail E NA <br />❑ Pass ❑ Fail E NA <br />❑ Pass <br />❑ Fail E NA <br />❑ Pass <br />❑ <br />Fail ❑ NA <br />Communication Test Result <br />❑ <br />Pass ❑ Fail R NA <br />❑ Pass ❑ Fail E NA <br />❑ Pass <br />❑ Fail E NA <br />❑ Pass <br />❑ <br />Fail ❑ NA <br />Turbine / Product Piping Sump <br />Tightness Test Result <br />E <br />Pass ❑ Fail ❑ NA <br />E Pass ❑ Fail ❑ NA <br />E Pass <br />❑ Fail ❑ NA <br />❑ Pass <br />❑ <br />Fail ❑ NA <br />Fill Riser Sump <br />Tightness Test Result <br />❑ <br />Pass ❑ Fail R NA <br />❑ Pass ❑ Fail R NA <br />❑ Pass <br />❑ Fail R NA <br />❑ Pass <br />❑ <br />Fail ❑ NA <br />b <br />C <br />d <br />VENT / TRANSITION SUMP ID: <br />a <br />Tightness Test Result <br />❑ <br />Pass ❑ Fail E NA <br />❑ Pass ❑ Fail E NA <br />❑ Pass <br />❑ Fail R NA <br />❑ Pass <br />❑ <br />Fail ❑ NA <br />1 <br />1&2 <br />2 3&4 <br />3 <br />5&6 <br />4 <br />7&8 <br />UDC ID: <br />Tightness Test Result <br />R <br />Pass ❑ Fail ❑ NA <br />E Pass ❑ Fail ❑ NA <br />E Pass <br />❑ Fail ❑ NA <br />R Pass <br />❑ <br />Fail ❑ NA <br />UDC ID: <br />5 <br />9&10 <br />6 11&12 <br />7 <br />13&14 <br />8 <br />15&16 <br />Tightness Test Result <br />R <br />Pass ❑ Fail ❑ NA <br />R Pass ❑ Fail ❑ NA <br />R Pass <br />❑ Fail ❑ NA <br />R Pass <br />❑ <br />Fail ❑ NA <br />UDC ID: <br />9 <br />17&18 <br />10 <br />11 <br />12 <br />Tightness Test Result <br />R <br />Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />❑ Pass <br />❑ Fail ❑ NA <br />❑ Pass <br />❑ <br />Fail ❑ NA <br />All items marked "Fail' or "NA" must be explained <br />in their respective "COMMENTS" section. <br />IV. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br />I hereby certify that the secondary containment was tested in accordance with California Code of Regulations, Title <br />3, Chapter 16, Section 2637 and all the information contained herein is accurate. <br />UST Service Technician Signature <br />23, Division <br />