Laserfiche WebLink
Valley Organics, Inc. <br />Application — Site Approval Exhibit B <br />Storm Drainage <br />No additional storm drainage will be created by the proposed improvements. All <br />water applied to the materials during processing will be absorbed or will <br />evaporate. <br />Lighting <br />Operations will be during daylight hours only; no lighting will be required. <br />Water Discharge Permit <br />As noted under Storm Drainage, any water applied to the material during <br />processing will be absorbed or evaporate. <br />Traffic Impact Mitigation <br />There should be no impact on area traffic. What few vehicle trips there will be <br />will access the site from Interstate 5 along Frewert Road. <br />Hazardous Material Management Plan <br />No hazardous materials will be stored on site. Fuel for the equipment will be <br />transported to the site on a daily basis in the truck assigned to the project. <br />Since all equipment is self -powered, only the well pump would be affected by a <br />utility service interruption. If from time to time the electrical service to the <br />property is interrupted, water can still be obtained by gravity feed from an 800 <br />gallon water tank that will be installed on site. <br />In rare cases of long term utility failure, a portable diesel generator will be <br />moved to the site to provide power. <br />Odor Management <br />The site is located in an agricultural area. See also: "Odor Management Impact <br />Plan" <br />