Laserfiche WebLink
We*gh-Tronix <br />Av <br />eIS0*v- <br />v- <br />CVOC/ <br />DATE: June 18, 2012 <br />QUOTATON NO.: 061812 -01 -SS <br />(Quotation valid for 30 days from above <br />CUSTOMER: Harvest / Valley Organics date unless otherwise noted) <br />916 Frewert Road <br />Lathrop, CA 95330 <br />Att. Jed Phelps <br />. helosCo7harvesOWES= <br />209.982.1381 Office <br />209.993.1668 Cell <br />209.9829836 Fax <br />❖ SCOPE OF WORK: <br />➢ Move existing Avery 70x11 Truck Scale to new foundation. Add second Remote Scoreboard to <br />increase truck traffic flow. Software modifications to drive the two Remote Displays' and utilize the <br />Red(Green options on the Display. Project is quoted for Standard working hours, M -F with allowing <br />the concrete to cure on Saturday and Sunday. <br />❖ PROJECT TIME LINE: <br />Project will take seven days to complete with weekend being two of the days. <br />❖ PRICING: <br />➢ Foundation: <br />Saw -cut existing asphalt concrete and excavate to allow new foundation installation. <br />Excavated asphalt will be removed from site and native material to left on site at direction of <br />owner. <br />• Form, place and finish foundation as per drawing No. 50547-0013 B. No approach slabs <br />included. This proposal is based on re -using existing concrete blocks at wing walls. <br />• Price includes demo of existing foundation. <br />• This price is valid for both options discussed on site, move scale to south or adjacent to <br />existing and south. Price does not include any asphalt paving. To pave new approaches will be <br />an additional sum of $6,850.00. <br />• Price does not include any conduit/wiring location as discussed on site. Existing conduittwiring <br />should be re -used for this new foundation. <br />• This proposal is based on performing all work in one move in and during normal working <br />hours. Valley Organics to provide a source for construction water and power at no charge. <br />• This proposal specifically excludes: unsuitable subgrade soils conditions and compaction; <br />swpp plans, monitoring or installation; engineering; survey; soils testing; all permits and fees; <br />bond costs; inspection fees; costs for testing, handling, and/or removing contaminated <br />materials. <br />FOUNDAITION PRICING ------------$18,500.00 <br />I` e^) C,tc /Z <br />O <br />