Laserfiche WebLink
0 0 <br /> existing air quality, including creation of objectionable odors; will future <br /> project residents be subjected to significant pollution levels? ❑Yes ® No* <br /> b. Will the project result in any impact to current climatic conditions? <br /> (Consider the introduction of water features, loss of wetland, etc.) ®Yes ® No <br /> Other sources used: Rule 4566 from the San Joaquin Valley Air Pollution Control <br /> District. <br /> 5. Noise: <br /> a. Will the project expose people to high noise or vibration levels (over <br /> 65db/Ldn for residential uses or 75db/Ldn for industrial uses at the <br /> property line)?-{Check 2090 projected noise-contours.) OYes 19 No* <br /> b. Will the project result in increased noise or vibration levels? OYes ® No <br /> Other sources used: <br /> 6. Energy/Natural Resources: <br /> a. Will the project use substantial amounts of fuel or energy, require a <br /> substantial increase in demand upon existing sources, or require the <br /> development of new sources of energy? ❑Yes ® No <br /> b. Will the project affect the potential use, extraction, conservation, <br /> or depletion of a natural resource(other than agricultural land)? OYes ® No <br /> Other sources used: <br /> 7. Hazards: <br /> a, Will the project create a risk of explosion; release, generate or store <br /> any hazardous substances; or cause other dangers to public health and <br /> safety? ®Yes ® No* <br /> b. Are there any known hazardous substances located within 500 feet of <br /> the boundaries of this project, if in an existing or proposed residential <br /> area (this could include possible groundwater contamination)? F]Yes ® No <br /> c. Will the project result in interference with, or need for, emergency plans? []Yes ® No <br /> Other sources used: <br /> 8. Utilities and Public Service: <br /> a. **Will the project require alteration of, addition to, or the need for new <br /> utility systems(water, sewer, drainage, solid waste), including a <br /> Sphere of Influence or district boundary change? ❑Yes ® No* <br /> b. —Will the project result in the need for or the expansion of the following <br /> Initial Study -5- Rev 5-00 <br /> 71185450.1 0078479-00001 <br />