Laserfiche WebLink
GENERAL CONSIDERATIONS: <br /> I Does it appear that any environmental feature of the project will generate significant public <br /> concern or controversy? <br /> L] Yes 0 No Nature of concern(s): <br /> 2. Will the project require approval or permits by agencies other than the County? <br /> 0 Yes 0 No Agency name(s): <br /> 3. Is the project within the Sphere of Influence, or within two miles, of any city? <br /> ®Yes 0 No City: Lathrop/Manteca <br /> ENVIRONMENTAL IMPACTS: <br /> "Yes" may only be checked in situations where there is substantial evidence to indicate that there <br /> may be a significant adverse impact on the environment if there is no change in the project <br /> description. (CE Guidelines, Sec. 15064) <br /> See the "Discussion" section at the end of the Initial Study for explanation of any impacts checked <br /> "Yes", or any"No" answer marked with an asterisk <br /> Sources: The following sources of information have been used in determining environmental <br /> impacts: <br /> Original source materials and maps on file in the Community Development Department including: <br /> all County and City general plans and community plans; assessor parcel books; various local and <br /> FEMA flood zone maps; service district maps; maps of geologic instability; maps and reports on <br /> endangered species such as the Natural Diversity Data Base; noise contour maps; specific roadway <br /> plans; maps and/or records of archeological/historic resources; soil reports and maps; etc. Many of <br /> these original source materials have been collected from other public agencies or from previously <br /> prepared E I R's and other technical studies. <br /> Additional standard sources which should be specifically cited below include on-site visits by staff <br /> (note date); staff knowledge or experience; and independent environmental studies submitted to the <br /> County as part of the project application (note report title, date, and consultant). <br /> 1. Water: <br /> a. Is any portion of the project subject to flood hazard? <br /> Flood zone:. X(levee) E]Yes E No* <br /> b. Will the project result in reduction of surface or ground water <br /> quality or quantity? OYes Z No <br /> c. Will the project result in increases to surface, channel or <br /> stream volumes, or alterations to drainage patterns and streams? L]Yes 0 No <br /> d. Will the project result in erosion of or sedimentation to a channel, <br /> Initial Study. -2- Rev 5-00 <br /> 'U-f7% <br />