Laserfiche WebLink
0 0 <br /> Preventative Measures to inhibit"track out" on Frewert Rd. <br /> During our 2015/2016 Budget meeting in May, Harvest Power management approved the following <br /> items to Prevent"track out" from our site. <br /> -Purchase of a sweeper attachment for bur skid steer loader. ' <br /> -Install rip rap rock to areas adjacent to entry/exit to our asphalted area. <br /> -purchase and use of a dust suppressant additive to use in our water truck to control dust while <br /> minimizing the use of water. <br /> The implementation of these measures will prevent mud from being tracked onto our asphalt area <br /> which in turn is tracked to Frewert Rd. If adjustments need to be made after these measures are <br /> implemented than Harvest Power will explore new remedies. The purchases were approved for July <br /> 2015. <br />