My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 11:36:26 AM
Creation date
2/3/2021 9:33:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Specifications <br /> • Model : 70& 590 Series <br /> • Type : Class I Automatic Overfill Shutoff Device—Gravity Fill Only <br /> • Size : Fits through 4 " schedule 40 ( DN 100 ) pipe <br /> • Flow rate : 25 - 370 GPM ( 94 - 1400 LPM ) <br /> • Static pressure rating : 10 PSI ( 0 . 7 bar ) MAX <br /> • Compatibility : Liquid petroleum fuel blends ( EO - E85 , 130- 1320 ) <br /> Valve operation <br /> The Franklin Fueling Systems ( FFS ) model 708 - 590 Series Overfill Prevention Valve ( OPV ) is <br /> designed with a primary shutoff that activates between 85 and 92 % of tank volume, depending <br /> on the tank diameter. When the primary shut- off is actuated , the flow through the OPV is limited <br /> to less than 8 GPM ( 30 LPM ) . A secondary, positive shutoff happens at 95 % tank volume if you <br /> continue filling . After primary shutoff, you can still drain the delivery hose, but you must be <br /> extremely careful and follow these steps : <br /> 1 . Close the truck bottom loading valve . <br /> 2 . Wait 5 minutes <br /> 3 . Partially open the coupler between the delivery hose and the bottom loading valve and <br /> allow the hose to drain . <br /> NOTE : Shutoff points are affected by the specific gravity of the stored liquids . These instructions <br /> are based on the average performance of all products . The OPV was designed to be only an <br /> emergency overfill prevention device . <br /> NOTE : Determine if the underground storage tank has a ball float vent valve . If it does , make sure <br /> the nipple portion does not extend more than 3 " ( 76 . 2 mm ) into the tank . <br /> 03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.