My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 11:36:26 AM
Creation date
2/3/2021 9:33:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A = The distance from the seat surface of the upper drop tube to the bottom of the underground <br /> storage tank . The seat surface will vary depending on the type of installation . See below. <br /> Underneath Fill Adapter Underneath Bucket Inside Bucket <br /> ( EBW Legacy Series ) (Phil•Tite Series) ( Defender Series ) <br /> A <br /> e o <br /> A <br /> A <br /> A <br /> 7B = FINAL SHUTOFF VOLUME HEIGHT - - According to industry recommended practices , FFS <br /> recommends that you set the final shutoff volume to a maximum of 95 % of the actual tank <br /> capacity. To find the final shutoff volume height, multiply the actual tank capacity ( gallons ) by <br /> the final shutoff volume percentage . ( if you are using 9S % tank volume , multiply the actual tank <br /> capacity by . 95 . ) You then locate the closest volume on the tank chart ( provided by the tank <br /> manufacturer ) , and record the corresponding height for " B . " <br /> * * NOTE : To accommodate tank tilt or increased/decreased usage of tank capacity, the final <br /> shutoff volume can be adjusted to a value other than 9S %, providing it meets all applicable <br /> regulatory requirements , and is acceptable to the Authority Having Jurisdiction (AH1 ) . If the final <br /> shutoff volume is not installed at 9S %, the installing contractor should document the new volume <br /> as intended and include it with the station records as reference for compliance inspections . The <br /> installing contractor can do this on the " OPV Installation Record Sheet " or any other applicable <br /> station records . <br /> If the final shutoff volume is installed greater than 95 %, make sure in all cases that there is at <br /> least 2S0 gallons of ullage volume remaining so that " . . . none of the fittings located on the top of <br /> the tank are exposed to product due to overfilling " according to EPA 40 CFR Part 280 . <br /> 7 <br /> ��i; <br />
The URL can be used to link to this page
Your browser does not support the video tag.