My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2300 - Underground Storage Tank Program
>
PR0231732
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 11:32:48 AM
Creation date
2/3/2021 10:07:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231732
PE
2361
FACILITY_ID
FA0003648
FACILITY_NAME
STKN ARMY AVIATION SUPP FACILITY*
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
01
SITE_LOCATION
2000 STIMSON RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Enviroif iE <br />alt <br />ENED <br />OCT'. 4 2021 <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be ENWR&MENTAL HEALTH <br />1. Site map enclosed? YES K NO[] <br />DEPARTMENT <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br />certificates for each person installing or testing any component. that is repaired or replaced. Ensure a copy of . <br />the "Site Health and Safety Plan" is available on the jobsite as required' by Title 8. <br />3. Detailed description of work #o be completed. ,List components to be repaired .or replaced and attach a . <br />diagram drawn to scale showing location of repairs and/or replacements. If repairing a component, describe <br />,how this will be done: (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br />use the UST Installation Application pages 4=8 as necessary for a timely. plan review): <br />bV�RF/tet-- <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />5. Decontamination Procedures: <br />a. WIII piping be decontaminated prior to removal? <br />V. Identify contractor performing decontamination: <br />Name '7;;iAI& 7 s4m . or(YAC_. <br />Address <br />3of6 <br />YES [ J <br />Phone 658— Do67 . <br />.City 1/��ilTGIR,4 Zip 3003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.