Laserfiche WebLink
Monitoring System Certification <br /> LST Monitoring Site Pian <br /> Site Address : _ CA ARNG , 2000 Stimson RD , Stockton <br /> L- 1 UST Annular 420 sensor <br /> North r <br /> L -2 UST STP 208 sensor Q <br /> L- 3 Reel UDC 208 sensor d. <br /> Proce <br /> L4 Trans Sump 208 sensor <br /> L-5 AST Annular 420 sensor <br /> L -4 Trans Sump <br /> 20K AS . <br /> Vaporless LD 3000 Underground product <br /> Line Leak Detector piping to AST <br /> L- 2 STP -� <br /> 15K UST <br /> Probe 0 / <br /> . .. . . n / � Ree: UDC Aboveground piping <br /> Overspill . Q Or <br /> Underground product <br /> p piping to loading reel <br /> L- 1 Annular <br /> ``— Veeder- Root . . . <br /> 10 - 21 - 2020 NoteF.jhis Reel U <Ihere we <br /> propose to replace a , won /4 conduit <br /> entry haat with a B a split regal- an two conduits <br /> 13 — Overfill Alarm E - Stop <br /> Date snap was cra \, m /P <br /> Instructions <br /> If you already have a diagram that shows all required information , you may include it ; rat !Icr than this page . with your <br /> Monitoring System Certification . On your site plan . show the general 1. ayuut of tanks and piping _ Clearly identi , <br /> Locations of the following equipment, it installed : monitorina Systeyn control panels ; sensors monitoring tank annular <br /> spaces , sumps , dispenser pans , spill containers, or other secondary containment areas : mechanical or electronic line leak <br /> detectors , and in -tank liquid level probes ( if used for leak detection ) . In the space provided _ note the date this Site Plait <br /> was prepared . <br /> Page of _ ps;pp <br />