My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 4:46:10 PM
Creation date
2/3/2021 2:42:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for Gemco Ripon Truck Plaza Inc. as of October 18, 2021. <br /> Open violations from June 24, 2021 inspection <br /> Violation#108-Failure to implement or maintain a written agreement between the UST owner and operator. <br /> OBSERVATION: The annual operating permit is not issued to the current operator and there is no written <br /> agreement between the person who was issued the permit and the operator to monitor the UST system. <br /> REGULATION GUIDANCE: If a permit is issued to a person other than the operator of the tank, that person shall <br /> enter into a written agreement with the operator of the tank to monitor the UST system. <br /> CORRECTIVE ACTION: Immediately upload the written agreement to the California Environmental Reporting <br /> System (CERS)and submit for review by the EHD. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#113-Failure to conduct secondary containment testing. <br /> OBSERVATION: Secondary containment testing was last performed on 5/15/2018 and was due by 5/2021. Testing <br /> has not been completed and is one months past due. <br /> REGULATION GUIDANCE: Secondary containment testing is required once every 36 months. <br /> CORRECTIVE ACTION: Immediately schedule this test and provide 48 hours notification to the EHD. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#115-Failure to submit"Monitoring System Certification Form"within 30 days of completion of <br /> the test. <br /> OBSERVATION:Annual monitoring system certification, leak detector testing, and spill container testing was <br /> performed on 02/10/2020 and a test report was submitted on 04/09/2020, one month late. <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the tests. <br /> CORRECTIVE ACTION: Take all necessary precautions to ensure testing and submittal of test reports are <br /> performed in a timely manner. <br /> Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.