Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for Gemco Ripon Truck Plaza Inc. as of October 18, 2021. <br /> Open violations from June 24, 2021 inspection <br /> Violation#108-Failure to implement or maintain a written agreement between the UST owner and operator. <br /> OBSERVATION: The annual operating permit is not issued to the current operator and there is no written <br /> agreement between the person who was issued the permit and the operator to monitor the UST system. <br /> REGULATION GUIDANCE: If a permit is issued to a person other than the operator of the tank, that person shall <br /> enter into a written agreement with the operator of the tank to monitor the UST system. <br /> CORRECTIVE ACTION: Immediately upload the written agreement to the California Environmental Reporting <br /> System (CERS)and submit for review by the EHD. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#113-Failure to conduct secondary containment testing. <br /> OBSERVATION: Secondary containment testing was last performed on 5/15/2018 and was due by 5/2021. Testing <br /> has not been completed and is one months past due. <br /> REGULATION GUIDANCE: Secondary containment testing is required once every 36 months. <br /> CORRECTIVE ACTION: Immediately schedule this test and provide 48 hours notification to the EHD. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#115-Failure to submit"Monitoring System Certification Form"within 30 days of completion of <br /> the test. <br /> OBSERVATION:Annual monitoring system certification, leak detector testing, and spill container testing was <br /> performed on 02/10/2020 and a test report was submitted on 04/09/2020, one month late. <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the tests. <br /> CORRECTIVE ACTION: Take all necessary precautions to ensure testing and submittal of test reports are <br /> performed in a timely manner. <br /> Page 2 of 7 <br />