<br />MECH EQUIPMENT SCHEDULE
<br />OESC.
<br />CAPACITIES
<br />AMB
<br />ELECTRICAL
<br />ACCESSORIES
<br />COOL
<br />ENT
<br />102
<br />ITEM QTY VOLT PH
<br />MODEL
<br />CFM
<br />HEAT
<br />COOLING
<br />INPUT
<br />TOTAL
<br />IN/OUT
<br />TOT/SEN
<br />TITUS
<br />CEILING
<br />BLADE
<br />4 -WAY
<br />WYE
<br />OUTPUT
<br />I
<br />S
<br />DB/
<br />PH
<br />SUPPLY
<br /><AGE
<br />2400
<br />72
<br />75.0
<br />85
<br />FLA 28.4 208V 3PH
<br />W/ ECONOMIZER
<br />CEILING
<br />0.5'
<br />56
<br />65.2
<br />65
<br />MCA 32.8, MOCP 50
<br />HIGH STATIC MOTOR
<br />TRIC
<br />110
<br />AFUE
<br />11,0 EER
<br />A, IB,
<br />ADR109A
<br />ROOF CURB WT=800#
<br />CR -1
<br />TITUS 350R
<br />82%
<br />60
<br />VERIFY REHEAT
<br />INSTALLED BY CONTRACTOR
<br />1C
<br />REFRIGERATI❑N EQUIPMENT SCHEDULE
<br />MARK
<br />MAKE
<br />DESCRIPTION
<br />CFM
<br />HEAT
<br />COOL
<br />ENT
<br />ELECTRICAL
<br />REMARKS
<br />MODEL
<br />MODEL
<br />MOUNT
<br />ESP
<br />INPUT
<br />TOTAL
<br />OSA
<br />FLA MCA VOLT
<br />TITUS
<br />CEILING
<br />BLADE
<br />4 -WAY
<br />WYE
<br />OUTPUT
<br />I
<br />SENS
<br />DB/
<br />PH
<br />SUPPLY
<br />T -BAR
<br />-
<br />BRANCH
<br />ABBREMATIONS W/OR WO SYMBOLS
<br />BRANCH/BRANCH DUCT
<br />CS -4A
<br />WB
<br />CEILING
<br />BLADE
<br />RFC -1
<br />TURBO AIR
<br />INDOOR
<br />1400
<br />NA
<br />NA
<br />110
<br />1,5A 120V 1PH
<br />WT=49# SUPPLIED BY TENANT
<br />A, IB,
<br />ADR109A
<br />REFRIGERATION
<br />CR -1
<br />TITUS 350R
<br />CEILING
<br />60
<br />VERIFY REHEAT
<br />INSTALLED BY CONTRACTOR
<br />1C
<br />INSTALL VD IN WYE
<br />COIL W/REHEAT
<br />All economizer, thermostat and fan systems shalt be
<br />RETURN
<br />T -BAR
<br />47
<br />BRANCH
<br />4.
<br />RCU-1
<br />TURBO AIR
<br />OUTDOOR
<br />NA
<br />NA
<br />NA
<br />100
<br />25A 208V 1PH MCA
<br />WT=300# SUPPLIED BY TENANT
<br />-
<br />TSO40MR404A
<br />REFRIGERATION
<br />All penetrations through fire rated assemblles shall
<br />UP THROUGH ROOF
<br />reports loaded up to the appropriate CHEERS or
<br />25SS
<br />25 MOPD 50
<br />INSTALLED BY CONTRACTOR
<br />CAL -Certs hosting service,
<br />2-T
<br />CONDENSING
<br />16,
<br />Contractor shall label all equipment with unique
<br />HWS,HWR
<br />T
<br />CHILLED WATER SUPPLY, RETURN
<br />identification using plastic engraved plates with 1/2'
<br />-
<br />be coordinated with the General Contractor to
<br />UNIT
<br />tall lettering indicating the equipment number and
<br />NATURAL GAS, LPG LINE
<br />provide one brand onsite,
<br />33,6
<br />state the areas served by the equipment. See
<br />6.
<br />RFC -2
<br />TURBO AIR
<br />INDOOR
<br />1400
<br />NA
<br />NA
<br />110
<br />L5A 120V 1PH
<br />WT=49# SUPPLIED BY TENANT
<br />A, 2B,
<br />ADR109A
<br />REFRIGERATION
<br />All work on this project shall conform to the
<br />FLEX DUCT
<br />and sagging.
<br />60
<br />VERIFY REHEAT
<br />INSTALLED BY CONTRACTOR
<br />2C
<br />STEAM CONDENSATE
<br />COIL W/REHEAT
<br />-
<br />an approved smoke system per the City of Ripon's
<br />CW
<br />47
<br />SHUT OFF/BALL VALVE
<br />standards in the presence of the inspector or fire
<br />RCU-2
<br />TURBO AIR
<br />JOUTDOOR
<br />NA
<br />NA
<br />NA
<br />100
<br />25A 208V 1PH MCA
<br />SUPPLIED BY TENANT
<br />2016 CEC
<br />TS040MR404A
<br />REFRIGERATION
<br />2016 CALIFORNIA GREEN BUILDING CODE.
<br />25SS
<br />25 MOPD 50
<br />IWT=300#
<br />INSTALLED BY CONTRACTOR
<br />2-T
<br />CONDENSING
<br />All Wye branches connected to a diffuser, grille or
<br />1
<br />T
<br />1
<br />register shall have a manual volume damper installed
<br />20.
<br />Condensate drain lines installed in direct or indirect
<br />UNIT
<br />I
<br />sunlight shalt be UV resistant CPVC or PVC pipe and
<br />33,6
<br />shall be painted to protect from UV radiation.
<br />DIFFUSER/REGISTER SCHEDULE
<br />MARK
<br />MAKE
<br />DESCRIPTIO
<br />FACE
<br />BLOW
<br />DAMPER
<br />COLOR
<br />REMARKS
<br />MODELCFM
<br />MODEL
<br />N
<br />MOUNT
<br />13.
<br />It Is the responsibility of the Mechanical Contractor
<br />'ESP
<br />OPERATING WT
<br />CS -4
<br />TITUS
<br />CEILING
<br />BLADE
<br />4 -WAY
<br />WYE
<br />WHITE
<br />INSTALL VD IN WYE
<br />100 WATT 120 10
<br />TDC-3-A4
<br />SUPPLY
<br />T -BAR
<br />-
<br />BRANCH
<br />ABBREMATIONS W/OR WO SYMBOLS
<br />BRANCH/BRANCH DUCT
<br />CS -4A
<br />TITUS
<br />CEILING
<br />BLADE
<br />4 -WAY
<br />WYE
<br />WHITE
<br />INSTALL VD IN WYE
<br />DN
<br />TDC-6-A4
<br />SUPPLY
<br />SURFACE
<br />-
<br />BRANCH
<br />AFF
<br />BRANCH/BRANCH DUCT
<br />CR -1
<br />TITUS 350R
<br />CEILING
<br />BLADE
<br />NA
<br />WYE
<br />WHITE
<br />INSTALL VD IN WYE
<br />15.
<br />All economizer, thermostat and fan systems shalt be
<br />RETURN
<br />T -BAR
<br />DEMOLITION TO BE REMOVED
<br />BRANCH
<br />4.
<br />BRANCH/BRANCH DUCT
<br />CONTRACTOR SHALL CONFIRM ALL REFLECTED CEILING GRID SYSTEMS WITH THE BORDER SPECIFIED
<br />IN THE SCHEDULE FOR LAYIN DIFFUSERS AND SHALL SUBMIT DIFFUSER BORDERS MATCHING GRID
<br />SYSTEMS.
<br />RUN ALL FRONT FACE REGISTER BLADES PARALLEL TO FLOOR WHEN MOUNTED IN WALLS
<br />SAS SAS - SEE ARCHITECTURAL SCHEDULE FOR FLOOR, CEILING AND WALL FINISHES. CONFIRM REGISTER
<br />FINISH (MILL OR PAINT) WITH ARCHITECT PRIOR TO ORDERING SLOTS.
<br />+ NO SCREW HOLES
<br />EXHAUST FAN SCHEDULE
<br />MARK
<br />MAKE
<br />DESC,
<br />CAPACITIES
<br />ELECTRICAL
<br />ACCESSORIES AND
<br />OPERATING WT#
<br />with the latest editions of CMC (SMACNA duct
<br />MODELCFM
<br />Flame spread <=25 and smoke <=50.
<br />ITEM QTY VOLT PH
<br />CONTROLS
<br />13.
<br />It Is the responsibility of the Mechanical Contractor
<br />'ESP
<br />RPM
<br />SONNIES
<br />CEF-I
<br />BROAN L100
<br />CEILING
<br />100
<br />0,5
<br />850
<br />5,4
<br />100 WATT 120 10
<br />BDD, BS, SPEED
<br />B#
<br />All contractor furnished equipment installation and
<br />-
<br />EXHAUST FAN
<br />ABBREMATIONS W/OR WO SYMBOLS
<br />startup instructions shall be kept with the piece of
<br />14,
<br />Insulate all ductwork per the T-24 energy
<br />W/
<br />CONTROLLER AND
<br />WITH OUT
<br />requirements found in the T-24 compliance report.
<br />-
<br />inspection. After final inspection, three sets of
<br />DN
<br />All ductwork shall be tested for leaks with a maximum
<br />GALVANIZED SHEET METAL
<br />operation, instaRatlon, maintenance and start-up
<br />-
<br />DISCONNECT
<br />AFF
<br />HVAC Notes
<br />SYMBOL
<br />sheet metal, insulation, liners, plastics, rubber
<br />1.
<br />Furnish and install all ductwork in accordance
<br />RECTANGULAR DUCT SIZE
<br />NET INSIDE DIMENSIONS
<br />cements, latex, etc, shall be made of materials with a
<br />G.D
<br />with the latest editions of CMC (SMACNA duct
<br />Flame spread <=25 and smoke <=50.
<br />FLEXIBLE SUPPLY DUCT, CLASS 1
<br />FLEXIBLE RETURN DUCT, CLASS 1
<br />construction standards),
<br />13.
<br />It Is the responsibility of the Mechanical Contractor
<br />2.
<br />All pipes, ductwork and conduit shall be Installed and
<br />DUCTWORK - GI SPIRAL PIPE
<br />to coordinate the Installation of his work Including
<br />IE
<br />seismically braced per SMACNA's Seismic Restraint
<br />TV
<br />equipment substitutions with the other trades
<br />FIRST LETTER CEILING
<br />LOCATION: I I FLOOR
<br />WALL
<br />CS -4 SECOND LETTER SUPPLY
<br />SERVICE: RETURN
<br />NUMBER -TYPE: EXHAUST
<br />SEE SCHED.
<br />300 - CFM, CUBIC FEET PER MINUTE
<br />12x12 - GRILLE NECK SIZE IN INCHES
<br />PROVIDE VD'S AT ALL WYES AND TAPS
<br />SUPPLYING GRILLES AND REGISTERS FOR
<br />BALANCING PER T-24.
<br />Guidelines, OSHPD pre -approval #R0010,
<br />THERMOSTAT, UNIT NO.
<br />including but no limited to electrical, fire sprinkler,
<br />3.
<br />All contractor furnished equipment installation and
<br />-
<br />framing and plumbing,
<br />ABBREMATIONS W/OR WO SYMBOLS
<br />startup instructions shall be kept with the piece of
<br />14,
<br />Insulate all ductwork per the T-24 energy
<br />W/
<br />equipment in weatherproof pouches until final
<br />WITH OUT
<br />requirements found in the T-24 compliance report.
<br />-
<br />inspection. After final inspection, three sets of
<br />DN
<br />All ductwork shall be tested for leaks with a maximum
<br />GALVANIZED SHEET METAL
<br />operation, instaRatlon, maintenance and start-up
<br />-
<br />static pressure In the duct of 1.0', maximum leakage
<br />AFF
<br />instructions shall be given to the Owner for each
<br />BELOW FINISHED FLOOR
<br />shall not exceed 4% of the total supply and return
<br />-
<br />piece of equipment per the Ca Green Building Code. All
<br />BFC
<br />air volumes.
<br />ABOVE FINISHED CEILING
<br />equipment shall be installed, isolated and supported
<br />15.
<br />All economizer, thermostat and fan systems shalt be
<br />-
<br />per the manufacturer's written instructions.
<br />DEMOLITION TO BE REMOVED
<br />tested per T-24 for compliance with the T-24 report
<br />4.
<br />All Fire and Fire Smoke Damper installation
<br />(E)
<br />and the appropriate forms indicated in the T-24
<br />instructions shall be made available to the inspecting
<br />POC
<br />report shall be provided and signed by the
<br />CUT OFF POINT
<br />authority for their review.
<br />-
<br />Contractor prior to project close out and the HERS
<br />5,
<br />All penetrations through fire rated assemblles shall
<br />UP THROUGH ROOF
<br />reports loaded up to the appropriate CHEERS or
<br />-
<br />be fire stopped and sealed with a material that
<br />LION
<br />CAL -Certs hosting service,
<br />CONDENSATE, OVERFLOW
<br />meets or exceeds the 'T' rating of the assembly
<br />16,
<br />Contractor shall label all equipment with unique
<br />HWS,HWR
<br />penetrated, Materials to be used for sealing shall
<br />CHILLED WATER SUPPLY, RETURN
<br />identification using plastic engraved plates with 1/2'
<br />-
<br />be coordinated with the General Contractor to
<br />MB
<br />tall lettering indicating the equipment number and
<br />NATURAL GAS, LPG LINE
<br />provide one brand onsite,
<br />-
<br />state the areas served by the equipment. See
<br />6.
<br />Install all pipe and duct insulation materials per T-24
<br />OUTSIDE AIR
<br />specifications on dwgs.
<br />-
<br />requirements. ALL material to be installed shall meet
<br />17.
<br />All flex duct will be stretched as tight as possible
<br />DUCT TEMPERATURE SENSOR
<br />CBC flame and smoke requirements per note 11,
<br />-
<br />and as per manufacturers listing to avoid alt kinks
<br />7.
<br />All work on this project shall conform to the
<br />FLEX DUCT
<br />and sagging.
<br />-
<br />following codes
<br />18,
<br />All smoke detectors shall be tested as required with
<br />STEAM CONDENSATE
<br />SC
<br />-
<br />an approved smoke system per the City of Ripon's
<br />CW
<br />2016 CBC
<br />SHUT OFF/BALL VALVE
<br />standards in the presence of the inspector or fire
<br />-
<br />2016 CPC
<br />DSD
<br />Marshall.
<br />2016 CMC
<br />19,
<br />All systems shall require an air balance report upon
<br />2016 CEC
<br />final inspection. Submit reports on NEBS or NABC
<br />2016 CALIFORNIA GREEN BUILDING CODE.
<br />forms an independent certified air balance showing
<br />system has been balanced and OSA quantities set to
<br />8.
<br />All Wye branches connected to a diffuser, grille or
<br />that shown on drawings.
<br />register shall have a manual volume damper installed
<br />20.
<br />Condensate drain lines installed in direct or indirect
<br />in the Wye branch, OBD's shall only be used when
<br />sunlight shalt be UV resistant CPVC or PVC pipe and
<br />Wye branches will be installed over inaccessible ceiling
<br />shall be painted to protect from UV radiation.
<br />areas or in the slab of the building. Dampers shall
<br />21.
<br />Seal all joints and seams with DP -1010 duct sealer,
<br />be fabricated of the same gauge as the duct with 1'
<br />standoff, Locking quadrant, and handle. Fasten red
<br />T-24 MECH AND PLUMBING MANDATORY FEATURES
<br />ribbon to handle to mark location,
<br />9.
<br />All gas pipe to be schedule 40 with screwed fittings,
<br />1.
<br />EQUIPMENT SHALL BE CERTIFIED TO MINIMUM EFFICIENCY
<br />All air conditioning/refrigeration condensate drain
<br />PER SECTION 110.2 - SEE SCHEDULES ON M-0,
<br />lines shall be schedule 40 PVC run to the an
<br />2.
<br />HVAC CONTROLS AND EQUIPMENT CERTIFIED PER SECTION
<br />approved receptor, Set pipe on redwood blocks with
<br />120.2 FOR THERMOSTATS AND DDC CONTROLS - SEE
<br />24 ga GI cover unless otherwise shown differently on
<br />DETAILS ON MO.
<br />drawings,
<br />3.
<br />SERVICE WATER HEATING SHALL COMPLY WITH SECTION
<br />10,
<br />Provide smoke detectors In the supply air duct on all
<br />110.3 ,
<br />units when the aggregate cfm exceeds 2000 cfm of
<br />4.
<br />USE OF PILOT LIGHTS ON HVAC, GAS COOKING POOL AND
<br />all equipment serving a room or more than one room
<br />SPA HEATERS PROHIBITED PER SECTION 110.5
<br />and the room has no direct exits to the exterior,
<br />5.
<br />LAVATORIES SHALL BE SET TO MAINTAIN DISCHARGE TEMP
<br />Duct smoke detectors shall be installed after the
<br />AT 110°F OR LESS PER SECTION 110.3 - SEE PLUMBING
<br />supply fan before any branch takeoffs. When more
<br />SCHEDULE
<br />than one unit serves a TI space and the aggregate
<br />6.
<br />VENTILATION REQUIREMENTS PER 120.1.b,c&d M-1 AIR
<br />cfm of the units serving the TI space exceeds 2000
<br />BALANCE
<br />cfm, all HVAC equipment shall have duct smoke
<br />7.
<br />NATURAL VENTILATION PER 120.1,1o.1 N/A
<br />detectors. All duct smoke detectors shall be wired
<br />8,
<br />CONTROLS SHALL MEET REQUIREMENTS PER 122, SEE M-0
<br />to shut down all units when a single unit alarms.
<br />AND NOTES.
<br />When fire detection or alarm systems are provided
<br />9,
<br />SHUT DOWN AND BACKDRAFT DAMPERS PER 122,f See
<br />for the building, all smoke detectors including those
<br />schedules on M-0
<br />installed for fire smoke dampers shall be supervised
<br />10.
<br />ISOLATION AREA DEVICES PER 122.9 N/A
<br />by such systems per 608.1 CMC. Such connections
<br />11.
<br />PIPE INSULATION PER 120.3.9 SEE NOTES, TABLE 120.3-A
<br />shall be shown on the deferred fire alarm submittal.
<br />12.
<br />REQUIREMENTS FOR DUCTS AND PLENUMS PER 124 SEE
<br />11.
<br />Such connections shall be shown on deferred fire
<br />M-0, NOTES AND SPECIFICATIONS
<br />alarm submittal,
<br />13,
<br />MECHANICAL ACCEPTANCE TEST FORMS SUBMITTED AT END
<br />12.
<br />Alt exposed ductwork shall be GI pipe and fittings.
<br />OF PROJECT PER SECTION 120.5, 120.7 AND 120.8 - SEE
<br />Line alt rectangular duct with insulation with the
<br />T24 DRAWINGS FOR FORMS REQUIRED (1-17) TO BE
<br />R -value listed in T-24 for the location of the duct
<br />SUBMITTED AT THE END OF THE PROJECT FOR EACH HVAC
<br />(attic, conditioned or outside). All duct materials
<br />AND PLUMBING SYSTEM, AND FOR EACH HVAC AND
<br />from insulation to mastics Including but not limited to
<br />PLUMBING PIECE OF EQUIPMENT.
<br />SYMBOL LEGEND
<br />SYMBOL
<br />ITEM
<br />ABBREV.
<br />DRAWN :
<br />RECTANGULAR DUCT SIZE
<br />NET INSIDE DIMENSIONS
<br />CHECKED :
<br />G.D
<br />LINED DUCT WITH INSULATION
<br />SEE DRAWING FOR THICKNESS
<br />FLEXIBLE SUPPLY DUCT, CLASS 1
<br />FLEXIBLE RETURN DUCT, CLASS 1
<br />VD
<br />W - DAMPER, REQUIRED
<br />FD - FIRE DAMPER
<br />FIRE D
<br />FSD - FIRE SMOKE DAMPER
<br />CSFD - CEIL. FIRE SMOKE DAMPER
<br />MD DM - MOTORIZED DAMPER IMD.
<br />NONE
<br />FDR
<br />FSD
<br />CSFO
<br />DM
<br />DUCTWORK - GI SPIRAL PIPE
<br />IE
<br />TURNING VANES
<br />TV
<br />300
<br />CS -4
<br />®1202
<br />-
<br />CR -1
<br />01
<br />CE -1 JAIR
<br />FIRST LETTER CEILING
<br />LOCATION: I I FLOOR
<br />WALL
<br />CS -4 SECOND LETTER SUPPLY
<br />SERVICE: RETURN
<br />NUMBER -TYPE: EXHAUST
<br />SEE SCHED.
<br />300 - CFM, CUBIC FEET PER MINUTE
<br />12x12 - GRILLE NECK SIZE IN INCHES
<br />PROVIDE VD'S AT ALL WYES AND TAPS
<br />SUPPLYING GRILLES AND REGISTERS FOR
<br />BALANCING PER T-24.
<br />O
<br />THERMOSTAT, UNIT NO.
<br />-
<br />RI H ©
<br />BYPASS, NITESTAT, CLOCK
<br />-
<br />ABBREMATIONS W/OR WO SYMBOLS
<br />-
<br />WITH
<br />W/
<br />-
<br />WITH OUT
<br />WO/
<br />-
<br />DOWN
<br />DN
<br />-
<br />GALVANIZED SHEET METAL
<br />GI
<br />-
<br />ABOVE FINISHED FLOOR
<br />AFF
<br />-
<br />BELOW FINISHED FLOOR
<br />BFF
<br />-
<br />BELOW FINISHED CEILING
<br />BFC
<br />-
<br />ABOVE FINISHED CEILING
<br />AFC
<br />-
<br />NEW DUCTWORK
<br />-
<br />-X- X
<br />DEMOLITION TO BE REMOVED
<br />TBR
<br />DUCTWORK EXISTING
<br />(E)
<br />POINT OF CONNECTION
<br />POC
<br />CUT OFF POINT
<br />COP
<br />-
<br />FURNISHED BY OTHERS
<br />FBO
<br />-
<br />UP THROUGH ROOF
<br />UTR
<br />-
<br />UNLESS OTHERWISE NOTED
<br />LION
<br />- C
<br />CONDENSATE, OVERFLOW
<br />C, OF
<br />- HWS
<br />HEATING WATER SUPPLY, RETURN
<br />HWS,HWR
<br />- CHWS-
<br />CHILLED WATER SUPPLY, RETURN
<br />CHWS,CHWR
<br />-
<br />MACHINE BOLT
<br />MB
<br />G,LPG
<br />NATURAL GAS, LPG LINE
<br />G, LPG
<br />-
<br />ALL THREAD ROD
<br />ATR
<br />-
<br />OUTSIDE AIR
<br />OSA
<br />-
<br />FEET PER MINUTE
<br />FPM
<br />0-
<br />DUCT TEMPERATURE SENSOR
<br />DTS
<br />-
<br />FLEXIBLE DUCT CONNECTOR
<br />FC
<br />-
<br />FLEX DUCT
<br />-
<br />-
<br />STEAM PIPE
<br />S
<br />-
<br />STEAM CONDENSATE
<br />SC
<br />-
<br />MAKEUP WATER
<br />CW
<br />IXI
<br />SHUT OFF/BALL VALVE
<br />BV
<br />-
<br />DUCT SMOKE DETECTOR
<br />DSD
<br />ATTACH HP -1 TO
<br />CURB W/2-
<br />3/8'X1-1/2'SET IN
<br />MASTIC WITH ISO
<br />PAD UNDER UNIT
<br />ATTACH TOP TO CURB
<br />W/3/8'X1-1/2'
<br />LAGS 24' OC
<br />18 GA MIN
<br />CURB W/2x4
<br />NAILER
<br />14' MIN HT -
<br />RIDGID ISULATION
<br />BY MECHANICAL
<br />CONTRACTOR -
<br />CANT STRIP
<br />BY ROOFER -
<br />24 GA GI COUNTER
<br />FLASHING -
<br />1/4"0x2 -1/2'
<br />LAG BOLT
<br />EMBED 2' MIN
<br />PLACE 48'DC
<br />NON-STANDARD ABBREVIATIONS:
<br />RTU - ROOF TOP UNIT
<br />HPFC - HEATPUMP FAN COIL
<br />SCHPFC - SELF CONTAINED HEAT
<br />PUMP FAN COIL
<br />CEF - CEILING EXHAUST FAN
<br />REF - ROOF EXHAUST FAN
<br />OHP - OUTDOOR HEAT PUMP
<br />CU - CONDENSING UNIT
<br />FC - FAN COIL
<br />OHP-, CU-. RCU-
<br />WT=331# EACH MAX
<br />24 GA GI CAP
<br />OVER 30# ROOFING -
<br />FELT
<br />((�� 1-1/8' PLYWOOD
<br />CAP - MAX SPAN
<br />F36'
<br />AT PUMP MOUNTING DETAIL
<br />DETAIL
<br />NECK SI
<br />T -BAR REGISTER
<br />DETAIL
<br />CR -1 RA PLENUM
<br />4-#12GA CEILING WIRES TO
<br />SUPPORT 1' THICK DUCT BOARD
<br />ELBOW AND REGISTER. ATTACH
<br />REGISTER TO T -BAR W/(2)
<br />#7x1/2' S/M SCREWS THRU
<br />OUTLET FLANGE TO GRID RUNNER
<br />ON OPPOSITE CORNER
<br />0
<br />CV
<br />X
<br />N
<br />2'x24 GA GI DUCT SUPPORT STRAP
<br />WITHIN 2' OF REGISTER - MIN FLEX
<br />DUCT LENGTH IS 3'2' SO THAT ALL
<br />DUCTS SHALL DISPLAY THE DUCT
<br />SIZE AND INSULATION VALUE AND
<br />MAX LENGTH IS 10' FOR OSHPD, 5'0'
<br />FOR ALL OTHERS. ALL ELBOW
<br />RADIUS'S TO BE 15 DUCT DIAMETER,
<br />FLEX DUCT TURNS TO BE 2,0 DUCT
<br />DIAMETER
<br />SAT CEILING SYSTEM
<br />AIR OUTLET - WT<10#
<br />NOTE,
<br />SECURE CEILING OUTLET TO S.A.T.
<br />CEILING GRID WITH (2) #10x1/2' S/M
<br />SCREWS THRU OUTLET FLANGE TO
<br />GRID RUNNER AND AT DIAGONAL
<br />CORNERS INSTALL (2) #12 GA. SLACK
<br />WIRES ATTACHED TO STRUCTURE
<br />ABOVE USING CLOSED LOOP EYEBOLTS.
<br />WIRE AND SCREWS ARE REQUIRED ON
<br />ALL REGISTERS.
<br />DISCONNECT - RUN
<br />T -STAT WIRE IN
<br />SEAL TIGHT
<br />CONDUIT TO ACCU-
<br />LIQUID LINE WITH LIQUID
<br />LINE DRIER AND MOISTURE
<br />INDICATING SIGHT GLASS ATS
<br />CONDENSING UNIT
<br />2 -PAIR 18 GA WIRE
<br />- RUN IN 3/4'
<br />CONDUIT TO ACCU�
<br />(E) ROOF LINE -
<br />EQUIPM
<br />GENER
<br />CU-
<br />INVERTED SUCTION TRAP -
<br />UNITS 20' OR HIGHER THAN FC
<br />NT IN
<br />STUB CONDUIT 6'.
<br />ABOVE MEZZANINE
<br />3/4' CONDUIT IN Wi
<br />MOUNT T -STAT 48' AFF
<br />AWAY FROM HEAT
<br />PRODUCING DEVICES;
<br />COORDINATE LOCATION
<br />WITH OWNER
<br />AC-
<br />GASKET- USE MANUFACTURER'S
<br />SUPPLIED WITH CURB -
<br />12 GA ANGLE CLIP - ATTACH
<br />TO CURB W/3#10x1' SM SCREWS
<br />TO UNIT W/#10x1' SM SCREWS
<br />CLIP TO BE 6'MIN LONG. 2 EA
<br />LONG SIDE OF UNIT AT CORNERS
<br />26 GA GI
<br />COUNTERFLASHING
<br />(E)AC- MANUFACTURER'S ROOF CURB
<br />14' MIN HT, 18 MIN CONSTRUCTION
<br />CURB INSTALLED AS PART OF SHELL
<br />PERMIT
<br />SEAL AIRTIG
<br />SHEET METAL DUCT
<br />W/1' 6.2R LINER
<br />TU- ATTACHMENT TO CURB
<br />PLYWOOD/SKIP
<br />SHEETING ROOF
<br />ATTACH TO (E) JOISTS
<br />WITH 1-#10x1-1/2',
<br />FASTAP SCREW.
<br />W/2 -1/4'0x2' LAGS -
<br />EMBED 1-1/2' MIN
<br />DOUBLE NUTTED ALLDUCT STRAP
<br />THREAD ROD WITH PER CMC
<br />SO 1-i'XI-}'xII'
<br />WASHER TO SUPPORT /
<br />STRAP
<br />OR' ;
<br />Y BAND
<br />ID PIPE
<br />'A' DUCT SUPPORT
<br />PLYWOOD/SKIP
<br />SHEETING ROOF
<br />1/8'x2' LAG BOLT
<br />EMBED 1'INiOY
<br />JOIST/TRUSS
<br />1-%'xl-J'x18 GA
<br />SEISMIC BRACE
<br />-LOCATE EVERY 40'
<br />AND AT CHANGES IN
<br />DIRECTION OF PIPE
<br />LATERAL BRACE
<br />40' OC AND AT
<br />CHANGE OF
<br />DIRECTION
<br />2x2x}' ANGLE
<br />- ATTACH TO
<br />JOIST/TRUSS
<br />--W/ exl-1/2'
<br />LAG BOLT -
<br />EMBED V MIN
<br />DOUBLE NUTTED ALL
<br />THREAD ROD WITH SQ
<br />1 -}'x1 -}'x6' WASHER
<br />TO SUPPORT STRAP
<br />1-}'x24 GA BELLY
<br />--BAND AROUND PIPE
<br />DUCT IS EXPOSED
<br />LATERAL BRACE 80'
<br />OC AND AT CHANGE
<br />OF DIRECTION
<br />'B' SEISMIC ANCHORAGE DETAIL
<br />DUCT DUPP❑RTS
<br />DETAIL
<br />FLEX DUCT TO MAIN RUN TO BE
<br />MIN 3'2' LENGTH SO THAT THE
<br />DUCT SIZE AND INSULATION
<br />VALUE IS SHOWN ON ALL DUCTS
<br />AND MAX LENGTH TO BE 10'0' FOR
<br />OSHPD AND 5'0' FOR ALL OTHERS.
<br />16' GI DUCT EXTENSION
<br />ABOVE CEILING
<br />INSULATION, FLEX
<br />DUCT TO MAIN RUN
<br />24 GAUGE GI REGISTER
<br />CAN
<br />SCREW CAN TO
<br />BLOCKING - 4 TOTAL
<br />SCREW CONTINOUS
<br />METAL TAB TO CAN
<br />W/6 SCREWS 2
<br />O OPPOSITE SIDE AND 1
<br />IN EACH OTHER SIDE
<br />REGISTER - SEE PLAN
<br />FOR SIZES - PROVIDE
<br />1/2' SOUND LINER IN
<br />REGISTER CAN
<br />CEILING REG DETAIL
<br />2
<br />DETAIL k M i
<br />408v 30
<br />W/GROUND
<br />WIRE
<br />FUSED DISC BY
<br />ELECTRICAL
<br />CONTRACTOR
<br />RTU-
<br />RH G Y1 Y2 W1 W2 C
<br />RC RH G Y1 Y2 W1 W2 C
<br />HONEYWELL VISIONPRO 8000 WITH
<br />AUTOMATED DEMAND RESPONSE
<br />FUNCTION SERIES Y AND W
<br />TERMINALS TO MATCH UNITS
<br />OHONEYWELL C7232(
<br />CO2 SENSOR, WALL
<br />RC 0 IOVDC MOUNTED WITH 24
<br />POWER
<br />THERMOSTAT
<br />D ETAI L
<br />UNE VOLTAGE WIRING BY EC
<br />-LINE VOLTAGE WIRING BY MC
<br />-LOW VOLTAGE WIRING BY MC
<br />NOTE APPLIES TO ALL DETAILS
<br />120v 10
<br />W/GROUND
<br />WIRE
<br />ECON LOGIC
<br />BOARD
<br />DSD, SO
<br />AIR PRODUCTS SL 201
<br />PHOTELECTRIC SMOKE
<br />DETECTOR
<br />FIREX REMOTE
<br />TEST SWITCH GRN LED p
<br />AND LED'S RED LED LI
<br />HORN/STROBE 0
<br />RESET O
<br />AIR PRODUCTS
<br />MS-RH/KA/P/AT
<br />JOB# 2019-097
<br />GDMD ENGINEERING, INC
<br />Mechanical and Safety Engineers
<br />212 W Pine St, Ste 4
<br />Lodi, Ca 95242
<br />Ph 209-367-0899
<br />Fax 209-367-0898
<br />E-mail:gdmdengrinc@sbcglobal.net
<br />apiCOPYRIGHT 20'19
<br />THIS DOCUMENT, AND THE IDEAS AND DESIGNS
<br />INCORPORATED HEREIN, AS AN INSTRUMENT OF
<br />PROFESSIONAL SERVICE, IS THE PROPERTY OF
<br />"api" AND IS NOT TO BE USED, IN WHOLE OR IN
<br />PART, FOR ANY OTHER PROJECT WITHOUT
<br />WRITTEN AUTHORIZATION.
<br />PLANNING ■ ■ ■
<br />ARCHITECTURE ■ ■ ■
<br />0
<br />0
<br />Z
<br />Vi
<br />O
<br />7 -
<br />vi w
<br />0
<br />2
<br />U
<br />Q
<br />U
<br />Z
<br />Q
<br />U
<br />ARCHITECTURE PLUS INC.
<br />4335-B NORTH STAR WAY
<br />MODESTO, CA 95356
<br />ph. 209.577.4661
<br />fx. 209.577.0213
<br />www.apiarc.com
<br />FRANK C. BOOTS
<br />JOSEPH L. SMITH
<br />RODNEY C. ALONZO
<br />ARCHITECTS
<br />W Z a
<br />he
<br />WC ode
<br />IX G Z
<br />Q W O
<br />AL
<br />� 0
<br />Q I}i O
<br />N � z
<br />0!1
<br />Q Z 0
<br />oC Q
<br />OC Z
<br />W ui >
<br />ag
<br />/AGONAL
<br />G.
<br />J
<br />N0:
<br />REN. 6-30--30- 200
<br />\�'cHAN�GP<
<br />OF C
<br />Q
<br />U
<br />Z
<br />O
<br />d
<br />-
<br />DATE:
<br />AUGUST 2019
<br />JOB NO.:
<br />18-114
<br />DRAWN :
<br />P.0
<br />CHECKED :
<br />G.D
<br />SHEET
<br />MO