Laserfiche WebLink
+ <br />MECH EQUIPMENT SCHEDULE <br />OESC. <br />CAPACITIES <br />AMB <br />ELECTRICAL <br />ACCESSORIES <br />COOL <br />ENT <br />102 <br />ITEM QTY VOLT PH <br />MODEL <br />CFM <br />HEAT <br />COOLING <br />INPUT <br />TOTAL <br />IN/OUT <br />TOT/SEN <br />TITUS <br />CEILING <br />BLADE <br />4 -WAY <br />WYE <br />OUTPUT <br />I <br />S <br />DB/ <br />PH <br />SUPPLY <br /><AGE <br />2400 <br />72 <br />75.0 <br />85 <br />FLA 28.4 208V 3PH <br />W/ ECONOMIZER <br />CEILING <br />0.5' <br />56 <br />65.2 <br />65 <br />MCA 32.8, MOCP 50 <br />HIGH STATIC MOTOR <br />TRIC <br />110 <br />AFUE <br />11,0 EER <br />A, IB, <br />ADR109A <br />ROOF CURB WT=800# <br />CR -1 <br />TITUS 350R <br />82% <br />60 <br />VERIFY REHEAT <br />INSTALLED BY CONTRACTOR <br />1C <br />REFRIGERATI❑N EQUIPMENT SCHEDULE <br />MARK <br />MAKE <br />DESCRIPTION <br />CFM <br />HEAT <br />COOL <br />ENT <br />ELECTRICAL <br />REMARKS <br />MODEL <br />MODEL <br />MOUNT <br />ESP <br />INPUT <br />TOTAL <br />OSA <br />FLA MCA VOLT <br />TITUS <br />CEILING <br />BLADE <br />4 -WAY <br />WYE <br />OUTPUT <br />I <br />SENS <br />DB/ <br />PH <br />SUPPLY <br />T -BAR <br />- <br />BRANCH <br />ABBREMATIONS W/OR WO SYMBOLS <br />BRANCH/BRANCH DUCT <br />CS -4A <br />WB <br />CEILING <br />BLADE <br />RFC -1 <br />TURBO AIR <br />INDOOR <br />1400 <br />NA <br />NA <br />110 <br />1,5A 120V 1PH <br />WT=49# SUPPLIED BY TENANT <br />A, IB, <br />ADR109A <br />REFRIGERATION <br />CR -1 <br />TITUS 350R <br />CEILING <br />60 <br />VERIFY REHEAT <br />INSTALLED BY CONTRACTOR <br />1C <br />INSTALL VD IN WYE <br />COIL W/REHEAT <br />All economizer, thermostat and fan systems shalt be <br />RETURN <br />T -BAR <br />47 <br />BRANCH <br />4. <br />RCU-1 <br />TURBO AIR <br />OUTDOOR <br />NA <br />NA <br />NA <br />100 <br />25A 208V 1PH MCA <br />WT=300# SUPPLIED BY TENANT <br />- <br />TSO40MR404A <br />REFRIGERATION <br />All penetrations through fire rated assemblles shall <br />UP THROUGH ROOF <br />reports loaded up to the appropriate CHEERS or <br />25SS <br />25 MOPD 50 <br />INSTALLED BY CONTRACTOR <br />CAL -Certs hosting service, <br />2-T <br />CONDENSING <br />16, <br />Contractor shall label all equipment with unique <br />HWS,HWR <br />T <br />CHILLED WATER SUPPLY, RETURN <br />identification using plastic engraved plates with 1/2' <br />- <br />be coordinated with the General Contractor to <br />UNIT <br />tall lettering indicating the equipment number and <br />NATURAL GAS, LPG LINE <br />provide one brand onsite, <br />33,6 <br />state the areas served by the equipment. See <br />6. <br />RFC -2 <br />TURBO AIR <br />INDOOR <br />1400 <br />NA <br />NA <br />110 <br />L5A 120V 1PH <br />WT=49# SUPPLIED BY TENANT <br />A, 2B, <br />ADR109A <br />REFRIGERATION <br />All work on this project shall conform to the <br />FLEX DUCT <br />and sagging. <br />60 <br />VERIFY REHEAT <br />INSTALLED BY CONTRACTOR <br />2C <br />STEAM CONDENSATE <br />COIL W/REHEAT <br />- <br />an approved smoke system per the City of Ripon's <br />CW <br />47 <br />SHUT OFF/BALL VALVE <br />standards in the presence of the inspector or fire <br />RCU-2 <br />TURBO AIR <br />JOUTDOOR <br />NA <br />NA <br />NA <br />100 <br />25A 208V 1PH MCA <br />SUPPLIED BY TENANT <br />2016 CEC <br />TS040MR404A <br />REFRIGERATION <br />2016 CALIFORNIA GREEN BUILDING CODE. <br />25SS <br />25 MOPD 50 <br />IWT=300# <br />INSTALLED BY CONTRACTOR <br />2-T <br />CONDENSING <br />All Wye branches connected to a diffuser, grille or <br />1 <br />T <br />1 <br />register shall have a manual volume damper installed <br />20. <br />Condensate drain lines installed in direct or indirect <br />UNIT <br />I <br />sunlight shalt be UV resistant CPVC or PVC pipe and <br />33,6 <br />shall be painted to protect from UV radiation. <br />DIFFUSER/REGISTER SCHEDULE <br />MARK <br />MAKE <br />DESCRIPTIO <br />FACE <br />BLOW <br />DAMPER <br />COLOR <br />REMARKS <br />MODELCFM <br />MODEL <br />N <br />MOUNT <br />13. <br />It Is the responsibility of the Mechanical Contractor <br />'ESP <br />OPERATING WT <br />CS -4 <br />TITUS <br />CEILING <br />BLADE <br />4 -WAY <br />WYE <br />WHITE <br />INSTALL VD IN WYE <br />100 WATT 120 10 <br />TDC-3-A4 <br />SUPPLY <br />T -BAR <br />- <br />BRANCH <br />ABBREMATIONS W/OR WO SYMBOLS <br />BRANCH/BRANCH DUCT <br />CS -4A <br />TITUS <br />CEILING <br />BLADE <br />4 -WAY <br />WYE <br />WHITE <br />INSTALL VD IN WYE <br />DN <br />TDC-6-A4 <br />SUPPLY <br />SURFACE <br />- <br />BRANCH <br />AFF <br />BRANCH/BRANCH DUCT <br />CR -1 <br />TITUS 350R <br />CEILING <br />BLADE <br />NA <br />WYE <br />WHITE <br />INSTALL VD IN WYE <br />15. <br />All economizer, thermostat and fan systems shalt be <br />RETURN <br />T -BAR <br />DEMOLITION TO BE REMOVED <br />BRANCH <br />4. <br />BRANCH/BRANCH DUCT <br />CONTRACTOR SHALL CONFIRM ALL REFLECTED CEILING GRID SYSTEMS WITH THE BORDER SPECIFIED <br />IN THE SCHEDULE FOR LAYIN DIFFUSERS AND SHALL SUBMIT DIFFUSER BORDERS MATCHING GRID <br />SYSTEMS. <br />RUN ALL FRONT FACE REGISTER BLADES PARALLEL TO FLOOR WHEN MOUNTED IN WALLS <br />SAS SAS - SEE ARCHITECTURAL SCHEDULE FOR FLOOR, CEILING AND WALL FINISHES. CONFIRM REGISTER <br />FINISH (MILL OR PAINT) WITH ARCHITECT PRIOR TO ORDERING SLOTS. <br />+ NO SCREW HOLES <br />EXHAUST FAN SCHEDULE <br />MARK <br />MAKE <br />DESC, <br />CAPACITIES <br />ELECTRICAL <br />ACCESSORIES AND <br />OPERATING WT# <br />with the latest editions of CMC (SMACNA duct <br />MODELCFM <br />Flame spread <=25 and smoke <=50. <br />ITEM QTY VOLT PH <br />CONTROLS <br />13. <br />It Is the responsibility of the Mechanical Contractor <br />'ESP <br />RPM <br />SONNIES <br />CEF-I <br />BROAN L100 <br />CEILING <br />100 <br />0,5 <br />850 <br />5,4 <br />100 WATT 120 10 <br />BDD, BS, SPEED <br />B# <br />All contractor furnished equipment installation and <br />- <br />EXHAUST FAN <br />ABBREMATIONS W/OR WO SYMBOLS <br />startup instructions shall be kept with the piece of <br />14, <br />Insulate all ductwork per the T-24 energy <br />W/ <br />CONTROLLER AND <br />WITH OUT <br />requirements found in the T-24 compliance report. <br />- <br />inspection. After final inspection, three sets of <br />DN <br />All ductwork shall be tested for leaks with a maximum <br />GALVANIZED SHEET METAL <br />operation, instaRatlon, maintenance and start-up <br />- <br />DISCONNECT <br />AFF <br />HVAC Notes <br />SYMBOL <br />sheet metal, insulation, liners, plastics, rubber <br />1. <br />Furnish and install all ductwork in accordance <br />RECTANGULAR DUCT SIZE <br />NET INSIDE DIMENSIONS <br />cements, latex, etc, shall be made of materials with a <br />G.D <br />with the latest editions of CMC (SMACNA duct <br />Flame spread <=25 and smoke <=50. <br />FLEXIBLE SUPPLY DUCT, CLASS 1 <br />FLEXIBLE RETURN DUCT, CLASS 1 <br />construction standards), <br />13. <br />It Is the responsibility of the Mechanical Contractor <br />2. <br />All pipes, ductwork and conduit shall be Installed and <br />DUCTWORK - GI SPIRAL PIPE <br />to coordinate the Installation of his work Including <br />IE <br />seismically braced per SMACNA's Seismic Restraint <br />TV <br />equipment substitutions with the other trades <br />FIRST LETTER CEILING <br />LOCATION: I I FLOOR <br />WALL <br />CS -4 SECOND LETTER SUPPLY <br />SERVICE: RETURN <br />NUMBER -TYPE: EXHAUST <br />SEE SCHED. <br />300 - CFM, CUBIC FEET PER MINUTE <br />12x12 - GRILLE NECK SIZE IN INCHES <br />PROVIDE VD'S AT ALL WYES AND TAPS <br />SUPPLYING GRILLES AND REGISTERS FOR <br />BALANCING PER T-24. <br />Guidelines, OSHPD pre -approval #R0010, <br />THERMOSTAT, UNIT NO. <br />including but no limited to electrical, fire sprinkler, <br />3. <br />All contractor furnished equipment installation and <br />- <br />framing and plumbing, <br />ABBREMATIONS W/OR WO SYMBOLS <br />startup instructions shall be kept with the piece of <br />14, <br />Insulate all ductwork per the T-24 energy <br />W/ <br />equipment in weatherproof pouches until final <br />WITH OUT <br />requirements found in the T-24 compliance report. <br />- <br />inspection. After final inspection, three sets of <br />DN <br />All ductwork shall be tested for leaks with a maximum <br />GALVANIZED SHEET METAL <br />operation, instaRatlon, maintenance and start-up <br />- <br />static pressure In the duct of 1.0', maximum leakage <br />AFF <br />instructions shall be given to the Owner for each <br />BELOW FINISHED FLOOR <br />shall not exceed 4% of the total supply and return <br />- <br />piece of equipment per the Ca Green Building Code. All <br />BFC <br />air volumes. <br />ABOVE FINISHED CEILING <br />equipment shall be installed, isolated and supported <br />15. <br />All economizer, thermostat and fan systems shalt be <br />- <br />per the manufacturer's written instructions. <br />DEMOLITION TO BE REMOVED <br />tested per T-24 for compliance with the T-24 report <br />4. <br />All Fire and Fire Smoke Damper installation <br />(E) <br />and the appropriate forms indicated in the T-24 <br />instructions shall be made available to the inspecting <br />POC <br />report shall be provided and signed by the <br />CUT OFF POINT <br />authority for their review. <br />- <br />Contractor prior to project close out and the HERS <br />5, <br />All penetrations through fire rated assemblles shall <br />UP THROUGH ROOF <br />reports loaded up to the appropriate CHEERS or <br />- <br />be fire stopped and sealed with a material that <br />LION <br />CAL -Certs hosting service, <br />CONDENSATE, OVERFLOW <br />meets or exceeds the 'T' rating of the assembly <br />16, <br />Contractor shall label all equipment with unique <br />HWS,HWR <br />penetrated, Materials to be used for sealing shall <br />CHILLED WATER SUPPLY, RETURN <br />identification using plastic engraved plates with 1/2' <br />- <br />be coordinated with the General Contractor to <br />MB <br />tall lettering indicating the equipment number and <br />NATURAL GAS, LPG LINE <br />provide one brand onsite, <br />- <br />state the areas served by the equipment. See <br />6. <br />Install all pipe and duct insulation materials per T-24 <br />OUTSIDE AIR <br />specifications on dwgs. <br />- <br />requirements. ALL material to be installed shall meet <br />17. <br />All flex duct will be stretched as tight as possible <br />DUCT TEMPERATURE SENSOR <br />CBC flame and smoke requirements per note 11, <br />- <br />and as per manufacturers listing to avoid alt kinks <br />7. <br />All work on this project shall conform to the <br />FLEX DUCT <br />and sagging. <br />- <br />following codes <br />18, <br />All smoke detectors shall be tested as required with <br />STEAM CONDENSATE <br />SC <br />- <br />an approved smoke system per the City of Ripon's <br />CW <br />2016 CBC <br />SHUT OFF/BALL VALVE <br />standards in the presence of the inspector or fire <br />- <br />2016 CPC <br />DSD <br />Marshall. <br />2016 CMC <br />19, <br />All systems shall require an air balance report upon <br />2016 CEC <br />final inspection. Submit reports on NEBS or NABC <br />2016 CALIFORNIA GREEN BUILDING CODE. <br />forms an independent certified air balance showing <br />system has been balanced and OSA quantities set to <br />8. <br />All Wye branches connected to a diffuser, grille or <br />that shown on drawings. <br />register shall have a manual volume damper installed <br />20. <br />Condensate drain lines installed in direct or indirect <br />in the Wye branch, OBD's shall only be used when <br />sunlight shalt be UV resistant CPVC or PVC pipe and <br />Wye branches will be installed over inaccessible ceiling <br />shall be painted to protect from UV radiation. <br />areas or in the slab of the building. Dampers shall <br />21. <br />Seal all joints and seams with DP -1010 duct sealer, <br />be fabricated of the same gauge as the duct with 1' <br />standoff, Locking quadrant, and handle. Fasten red <br />T-24 MECH AND PLUMBING MANDATORY FEATURES <br />ribbon to handle to mark location, <br />9. <br />All gas pipe to be schedule 40 with screwed fittings, <br />1. <br />EQUIPMENT SHALL BE CERTIFIED TO MINIMUM EFFICIENCY <br />All air conditioning/refrigeration condensate drain <br />PER SECTION 110.2 - SEE SCHEDULES ON M-0, <br />lines shall be schedule 40 PVC run to the an <br />2. <br />HVAC CONTROLS AND EQUIPMENT CERTIFIED PER SECTION <br />approved receptor, Set pipe on redwood blocks with <br />120.2 FOR THERMOSTATS AND DDC CONTROLS - SEE <br />24 ga GI cover unless otherwise shown differently on <br />DETAILS ON MO. <br />drawings, <br />3. <br />SERVICE WATER HEATING SHALL COMPLY WITH SECTION <br />10, <br />Provide smoke detectors In the supply air duct on all <br />110.3 , <br />units when the aggregate cfm exceeds 2000 cfm of <br />4. <br />USE OF PILOT LIGHTS ON HVAC, GAS COOKING POOL AND <br />all equipment serving a room or more than one room <br />SPA HEATERS PROHIBITED PER SECTION 110.5 <br />and the room has no direct exits to the exterior, <br />5. <br />LAVATORIES SHALL BE SET TO MAINTAIN DISCHARGE TEMP <br />Duct smoke detectors shall be installed after the <br />AT 110°F OR LESS PER SECTION 110.3 - SEE PLUMBING <br />supply fan before any branch takeoffs. When more <br />SCHEDULE <br />than one unit serves a TI space and the aggregate <br />6. <br />VENTILATION REQUIREMENTS PER 120.1.b,c&d M-1 AIR <br />cfm of the units serving the TI space exceeds 2000 <br />BALANCE <br />cfm, all HVAC equipment shall have duct smoke <br />7. <br />NATURAL VENTILATION PER 120.1,1o.1 N/A <br />detectors. All duct smoke detectors shall be wired <br />8, <br />CONTROLS SHALL MEET REQUIREMENTS PER 122, SEE M-0 <br />to shut down all units when a single unit alarms. <br />AND NOTES. <br />When fire detection or alarm systems are provided <br />9, <br />SHUT DOWN AND BACKDRAFT DAMPERS PER 122,f See <br />for the building, all smoke detectors including those <br />schedules on M-0 <br />installed for fire smoke dampers shall be supervised <br />10. <br />ISOLATION AREA DEVICES PER 122.9 N/A <br />by such systems per 608.1 CMC. Such connections <br />11. <br />PIPE INSULATION PER 120.3.9 SEE NOTES, TABLE 120.3-A <br />shall be shown on the deferred fire alarm submittal. <br />12. <br />REQUIREMENTS FOR DUCTS AND PLENUMS PER 124 SEE <br />11. <br />Such connections shall be shown on deferred fire <br />M-0, NOTES AND SPECIFICATIONS <br />alarm submittal, <br />13, <br />MECHANICAL ACCEPTANCE TEST FORMS SUBMITTED AT END <br />12. <br />Alt exposed ductwork shall be GI pipe and fittings. <br />OF PROJECT PER SECTION 120.5, 120.7 AND 120.8 - SEE <br />Line alt rectangular duct with insulation with the <br />T24 DRAWINGS FOR FORMS REQUIRED (1-17) TO BE <br />R -value listed in T-24 for the location of the duct <br />SUBMITTED AT THE END OF THE PROJECT FOR EACH HVAC <br />(attic, conditioned or outside). All duct materials <br />AND PLUMBING SYSTEM, AND FOR EACH HVAC AND <br />from insulation to mastics Including but not limited to <br />PLUMBING PIECE OF EQUIPMENT. <br />SYMBOL LEGEND <br />SYMBOL <br />ITEM <br />ABBREV. <br />DRAWN : <br />RECTANGULAR DUCT SIZE <br />NET INSIDE DIMENSIONS <br />CHECKED : <br />G.D <br />LINED DUCT WITH INSULATION <br />SEE DRAWING FOR THICKNESS <br />FLEXIBLE SUPPLY DUCT, CLASS 1 <br />FLEXIBLE RETURN DUCT, CLASS 1 <br />VD <br />W - DAMPER, REQUIRED <br />FD - FIRE DAMPER <br />FIRE D <br />FSD - FIRE SMOKE DAMPER <br />CSFD - CEIL. FIRE SMOKE DAMPER <br />MD DM - MOTORIZED DAMPER IMD. <br />NONE <br />FDR <br />FSD <br />CSFO <br />DM <br />DUCTWORK - GI SPIRAL PIPE <br />IE <br />TURNING VANES <br />TV <br />300 <br />CS -4 <br />®1202 <br />- <br />CR -1 <br />01 <br />CE -1 JAIR <br />FIRST LETTER CEILING <br />LOCATION: I I FLOOR <br />WALL <br />CS -4 SECOND LETTER SUPPLY <br />SERVICE: RETURN <br />NUMBER -TYPE: EXHAUST <br />SEE SCHED. <br />300 - CFM, CUBIC FEET PER MINUTE <br />12x12 - GRILLE NECK SIZE IN INCHES <br />PROVIDE VD'S AT ALL WYES AND TAPS <br />SUPPLYING GRILLES AND REGISTERS FOR <br />BALANCING PER T-24. <br />O <br />THERMOSTAT, UNIT NO. <br />- <br />RI H © <br />BYPASS, NITESTAT, CLOCK <br />- <br />ABBREMATIONS W/OR WO SYMBOLS <br />- <br />WITH <br />W/ <br />- <br />WITH OUT <br />WO/ <br />- <br />DOWN <br />DN <br />- <br />GALVANIZED SHEET METAL <br />GI <br />- <br />ABOVE FINISHED FLOOR <br />AFF <br />- <br />BELOW FINISHED FLOOR <br />BFF <br />- <br />BELOW FINISHED CEILING <br />BFC <br />- <br />ABOVE FINISHED CEILING <br />AFC <br />- <br />NEW DUCTWORK <br />- <br />-X- X <br />DEMOLITION TO BE REMOVED <br />TBR <br />DUCTWORK EXISTING <br />(E) <br />POINT OF CONNECTION <br />POC <br />CUT OFF POINT <br />COP <br />- <br />FURNISHED BY OTHERS <br />FBO <br />- <br />UP THROUGH ROOF <br />UTR <br />- <br />UNLESS OTHERWISE NOTED <br />LION <br />- C <br />CONDENSATE, OVERFLOW <br />C, OF <br />- HWS <br />HEATING WATER SUPPLY, RETURN <br />HWS,HWR <br />- CHWS- <br />CHILLED WATER SUPPLY, RETURN <br />CHWS,CHWR <br />- <br />MACHINE BOLT <br />MB <br />G,LPG <br />NATURAL GAS, LPG LINE <br />G, LPG <br />- <br />ALL THREAD ROD <br />ATR <br />- <br />OUTSIDE AIR <br />OSA <br />- <br />FEET PER MINUTE <br />FPM <br />0- <br />DUCT TEMPERATURE SENSOR <br />DTS <br />- <br />FLEXIBLE DUCT CONNECTOR <br />FC <br />- <br />FLEX DUCT <br />- <br />- <br />STEAM PIPE <br />S <br />- <br />STEAM CONDENSATE <br />SC <br />- <br />MAKEUP WATER <br />CW <br />IXI <br />SHUT OFF/BALL VALVE <br />BV <br />- <br />DUCT SMOKE DETECTOR <br />DSD <br />ATTACH HP -1 TO <br />CURB W/2- <br />3/8'X1-1/2'SET IN <br />MASTIC WITH ISO <br />PAD UNDER UNIT <br />ATTACH TOP TO CURB <br />W/3/8'X1-1/2' <br />LAGS 24' OC <br />18 GA MIN <br />CURB W/2x4 <br />NAILER <br />14' MIN HT - <br />RIDGID ISULATION <br />BY MECHANICAL <br />CONTRACTOR - <br />CANT STRIP <br />BY ROOFER - <br />24 GA GI COUNTER <br />FLASHING - <br />1/4"0x2 -1/2' <br />LAG BOLT <br />EMBED 2' MIN <br />PLACE 48'DC <br />NON-STANDARD ABBREVIATIONS: <br />RTU - ROOF TOP UNIT <br />HPFC - HEATPUMP FAN COIL <br />SCHPFC - SELF CONTAINED HEAT <br />PUMP FAN COIL <br />CEF - CEILING EXHAUST FAN <br />REF - ROOF EXHAUST FAN <br />OHP - OUTDOOR HEAT PUMP <br />CU - CONDENSING UNIT <br />FC - FAN COIL <br />OHP-, CU-. RCU- <br />WT=331# EACH MAX <br />24 GA GI CAP <br />OVER 30# ROOFING - <br />FELT <br />((�� 1-1/8' PLYWOOD <br />CAP - MAX SPAN <br />F36' <br />AT PUMP MOUNTING DETAIL <br />DETAIL <br />NECK SI <br />T -BAR REGISTER <br />DETAIL <br />CR -1 RA PLENUM <br />4-#12GA CEILING WIRES TO <br />SUPPORT 1' THICK DUCT BOARD <br />ELBOW AND REGISTER. ATTACH <br />REGISTER TO T -BAR W/(2) <br />#7x1/2' S/M SCREWS THRU <br />OUTLET FLANGE TO GRID RUNNER <br />ON OPPOSITE CORNER <br />0 <br />CV <br />X <br />N <br />2'x24 GA GI DUCT SUPPORT STRAP <br />WITHIN 2' OF REGISTER - MIN FLEX <br />DUCT LENGTH IS 3'2' SO THAT ALL <br />DUCTS SHALL DISPLAY THE DUCT <br />SIZE AND INSULATION VALUE AND <br />MAX LENGTH IS 10' FOR OSHPD, 5'0' <br />FOR ALL OTHERS. ALL ELBOW <br />RADIUS'S TO BE 15 DUCT DIAMETER, <br />FLEX DUCT TURNS TO BE 2,0 DUCT <br />DIAMETER <br />SAT CEILING SYSTEM <br />AIR OUTLET - WT<10# <br />NOTE, <br />SECURE CEILING OUTLET TO S.A.T. <br />CEILING GRID WITH (2) #10x1/2' S/M <br />SCREWS THRU OUTLET FLANGE TO <br />GRID RUNNER AND AT DIAGONAL <br />CORNERS INSTALL (2) #12 GA. SLACK <br />WIRES ATTACHED TO STRUCTURE <br />ABOVE USING CLOSED LOOP EYEBOLTS. <br />WIRE AND SCREWS ARE REQUIRED ON <br />ALL REGISTERS. <br />DISCONNECT - RUN <br />T -STAT WIRE IN <br />SEAL TIGHT <br />CONDUIT TO ACCU- <br />LIQUID LINE WITH LIQUID <br />LINE DRIER AND MOISTURE <br />INDICATING SIGHT GLASS ATS <br />CONDENSING UNIT <br />2 -PAIR 18 GA WIRE <br />- RUN IN 3/4' <br />CONDUIT TO ACCU� <br />(E) ROOF LINE - <br />EQUIPM <br />GENER <br />CU- <br />INVERTED SUCTION TRAP - <br />UNITS 20' OR HIGHER THAN FC <br />NT IN <br />STUB CONDUIT 6'. <br />ABOVE MEZZANINE <br />3/4' CONDUIT IN Wi <br />MOUNT T -STAT 48' AFF <br />AWAY FROM HEAT <br />PRODUCING DEVICES; <br />COORDINATE LOCATION <br />WITH OWNER <br />AC- <br />GASKET- USE MANUFACTURER'S <br />SUPPLIED WITH CURB - <br />12 GA ANGLE CLIP - ATTACH <br />TO CURB W/3#10x1' SM SCREWS <br />TO UNIT W/#10x1' SM SCREWS <br />CLIP TO BE 6'MIN LONG. 2 EA <br />LONG SIDE OF UNIT AT CORNERS <br />26 GA GI <br />COUNTERFLASHING <br />(E)AC- MANUFACTURER'S ROOF CURB <br />14' MIN HT, 18 MIN CONSTRUCTION <br />CURB INSTALLED AS PART OF SHELL <br />PERMIT <br />SEAL AIRTIG <br />SHEET METAL DUCT <br />W/1' 6.2R LINER <br />TU- ATTACHMENT TO CURB <br />PLYWOOD/SKIP <br />SHEETING ROOF <br />ATTACH TO (E) JOISTS <br />WITH 1-#10x1-1/2', <br />FASTAP SCREW. <br />W/2 -1/4'0x2' LAGS - <br />EMBED 1-1/2' MIN <br />DOUBLE NUTTED ALLDUCT STRAP <br />THREAD ROD WITH PER CMC <br />SO 1-i'XI-}'xII' <br />WASHER TO SUPPORT / <br />STRAP <br />OR' ; <br />Y BAND <br />ID PIPE <br />'A' DUCT SUPPORT <br />PLYWOOD/SKIP <br />SHEETING ROOF <br />1/8'x2' LAG BOLT <br />EMBED 1'INiOY <br />JOIST/TRUSS <br />1-%'xl-J'x18 GA <br />SEISMIC BRACE <br />-LOCATE EVERY 40' <br />AND AT CHANGES IN <br />DIRECTION OF PIPE <br />LATERAL BRACE <br />40' OC AND AT <br />CHANGE OF <br />DIRECTION <br />2x2x}' ANGLE <br />- ATTACH TO <br />JOIST/TRUSS <br />--W/ exl-1/2' <br />LAG BOLT - <br />EMBED V MIN <br />DOUBLE NUTTED ALL <br />THREAD ROD WITH SQ <br />1 -}'x1 -}'x6' WASHER <br />TO SUPPORT STRAP <br />1-}'x24 GA BELLY <br />--BAND AROUND PIPE <br />DUCT IS EXPOSED <br />LATERAL BRACE 80' <br />OC AND AT CHANGE <br />OF DIRECTION <br />'B' SEISMIC ANCHORAGE DETAIL <br />DUCT DUPP❑RTS <br />DETAIL <br />FLEX DUCT TO MAIN RUN TO BE <br />MIN 3'2' LENGTH SO THAT THE <br />DUCT SIZE AND INSULATION <br />VALUE IS SHOWN ON ALL DUCTS <br />AND MAX LENGTH TO BE 10'0' FOR <br />OSHPD AND 5'0' FOR ALL OTHERS. <br />16' GI DUCT EXTENSION <br />ABOVE CEILING <br />INSULATION, FLEX <br />DUCT TO MAIN RUN <br />24 GAUGE GI REGISTER <br />CAN <br />SCREW CAN TO <br />BLOCKING - 4 TOTAL <br />SCREW CONTINOUS <br />METAL TAB TO CAN <br />W/6 SCREWS 2 <br />O OPPOSITE SIDE AND 1 <br />IN EACH OTHER SIDE <br />REGISTER - SEE PLAN <br />FOR SIZES - PROVIDE <br />1/2' SOUND LINER IN <br />REGISTER CAN <br />CEILING REG DETAIL <br />2 <br />DETAIL k M i <br />408v 30 <br />W/GROUND <br />WIRE <br />FUSED DISC BY <br />ELECTRICAL <br />CONTRACTOR <br />RTU- <br />RH G Y1 Y2 W1 W2 C <br />RC RH G Y1 Y2 W1 W2 C <br />HONEYWELL VISIONPRO 8000 WITH <br />AUTOMATED DEMAND RESPONSE <br />FUNCTION SERIES Y AND W <br />TERMINALS TO MATCH UNITS <br />OHONEYWELL C7232( <br />CO2 SENSOR, WALL <br />RC 0 IOVDC MOUNTED WITH 24 <br />POWER <br />THERMOSTAT <br />D ETAI L <br />UNE VOLTAGE WIRING BY EC <br />-LINE VOLTAGE WIRING BY MC <br />-LOW VOLTAGE WIRING BY MC <br />NOTE APPLIES TO ALL DETAILS <br />120v 10 <br />W/GROUND <br />WIRE <br />ECON LOGIC <br />BOARD <br />DSD, SO <br />AIR PRODUCTS SL 201 <br />PHOTELECTRIC SMOKE <br />DETECTOR <br />FIREX REMOTE <br />TEST SWITCH GRN LED p <br />AND LED'S RED LED LI <br />HORN/STROBE 0 <br />RESET O <br />AIR PRODUCTS <br />MS-RH/KA/P/AT <br />JOB# 2019-097 <br />GDMD ENGINEERING, INC <br />Mechanical and Safety Engineers <br />212 W Pine St, Ste 4 <br />Lodi, Ca 95242 <br />Ph 209-367-0899 <br />Fax 209-367-0898 <br />E-mail:gdmdengrinc@sbcglobal.net <br />apiCOPYRIGHT 20'19 <br />THIS DOCUMENT, AND THE IDEAS AND DESIGNS <br />INCORPORATED HEREIN, AS AN INSTRUMENT OF <br />PROFESSIONAL SERVICE, IS THE PROPERTY OF <br />"api" AND IS NOT TO BE USED, IN WHOLE OR IN <br />PART, FOR ANY OTHER PROJECT WITHOUT <br />WRITTEN AUTHORIZATION. <br />PLANNING ■ ■ ■ <br />ARCHITECTURE ■ ■ ■ <br />0 <br />0 <br />Z <br />Vi <br />O <br />7 - <br />vi w <br />0 <br />2 <br />U <br />Q <br />U <br />Z <br />Q <br />U <br />ARCHITECTURE PLUS INC. <br />4335-B NORTH STAR WAY <br />MODESTO, CA 95356 <br />ph. 209.577.4661 <br />fx. 209.577.0213 <br />www.apiarc.com <br />FRANK C. BOOTS <br />JOSEPH L. SMITH <br />RODNEY C. ALONZO <br />ARCHITECTS <br />W Z a <br />he <br />WC ode <br />IX G Z <br />Q W O <br />AL <br />� 0 <br />Q I}i O <br />N � z <br />0!1 <br />Q Z 0 <br />oC Q <br />OC Z <br />W ui > <br />ag <br />/AGONAL <br />G. <br />J <br />N0: <br />REN. 6-30--30- 200 <br />\�'cHAN�GP< <br />OF C <br />Q <br />U <br />Z <br />O <br />d <br />- <br />DATE: <br />AUGUST 2019 <br />JOB NO.: <br />18-114 <br />DRAWN : <br />P.0 <br />CHECKED : <br />G.D <br />SHEET <br />MO <br />