Laserfiche WebLink
For the write up below: <br />Black text is copied from Elena Manzo 9/9/21 email of the amended report. <br />Blue text is Shell's response to respective item. <br />1. Violation 712 (EHD's checklist was recently updated, now it's violation <br />This violation was written because the facility failed to test or inspect each container for integrity based <br />on industry standards. Specifically, failing to implement a formal inspection for tank AG -8 by March 2020 <br />per API -653 report recommendation). The facility indicated that this inspection didn't need to be <br />Yes, the above statement in gray is still accurate for Tank AG -8, AG -1Q and AG -47 based on the attached <br />determination by the certified inspector, David Udonsen: Please note this is the same inspector that <br />performed the API 653 External Inspection for Tank AG -8 on March 2, 2015, <br />The Shell Pipeline Company LP, (SPCC), Tank and Pressure Vessel I & M Manual, Page 9.3-2 (referenced <br />in the SPCC plan) lists out the procedure for inspection of small diameter tanks, specifically indicating <br />that the following procedures must be followed: "1. Conduct evaluation to categorize the tank in <br />accordance with STI SP001. 2. Establish the inspection frequency for each tank basis tank type, tank size, <br />corrosion rates and inspection history." Since no inspection by a certified STI inspector was conducted <br />The above statement is not accurate and this information was never requested for review during the <br />audit or as a follow-up item. Reference the attached pdf which captures this assessment classifying Tank <br />AG -8 as STI Category 1 tanks and per STI Table 5.5 these tanks require Periodic (P) inspections and a 20 <br />year formal External Inspection (E). Therefore, as shown in the previously provided spreadsheet the next <br />formal External Inspection on AG -8 is March 2, 2035. 1 have circled the relevant items below and <br />attached the pdf for ease of review. <br />Based on the current schedule listed in the "Stockton Tank Database" (table), these requirements will <br />not be met until 2035 for the next onstream inspection and never for the next offstream inspection <br />(since no offstream inspection schedule is provided for this tank in the above table). <br />For Category #1 tanks per STI Table 5.5 there is no requirement to remove the tank from service to <br />perform an "offstream" inspection. Therefore, the "Stockton Tank Database" does reflect a date for the <br />next offstream inspection and is compliant with the STI regulations. <br />syxaw <br />ID <br />RRV�Am Is <br />so <br />At <br />AMU <br />Based on the current schedule listed in the "Stockton Tank Database" (table), these requirements will <br />not be met until 2035 for the next onstream inspection and never for the next offstream inspection <br />(since no offstream inspection schedule is provided for this tank in the above table). <br />For Category #1 tanks per STI Table 5.5 there is no requirement to remove the tank from service to <br />perform an "offstream" inspection. Therefore, the "Stockton Tank Database" does reflect a date for the <br />next offstream inspection and is compliant with the STI regulations. <br />