Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 9. COMMENTS <br /> Joor JDWS=Joor Jacketed Double Wall Steel. APT=Advanced Polymer Technology. <br /> PS=Piping Sump. Red DsIPS=Red Diesel Piping Sump. Trans PS-1=Transition Piping Sump-1. <br /> Trans PS-2=Transition Piping Sump-2. Unknown FGC=Unknown Fiberglass Construction. <br /> RD=Red Diesel. Bravo S-FGCS=Bravo Systems Fiberglass Coated Steel. <br /> Note: Crossovers connected at transition piping sumps for testing. Crossovers removed at end of <br /> testing. All test boots open at conclusion of testing to allow earliest detection of a primary pipe leak. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 5 of 5 <br />