Laserfiche WebLink
s � <br /> UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM(Page t of"1) <br /> Type of Action Installation Inspection ❑Repair Inspection ❑36 Month Inspection <br /> I. FA61LITY:INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> 5/1/2020 <br /> Business Name(Same as Facility Name or DBA-Doing Business As) <br /> Alpha Fast Gas <br /> Business Site Address City ZIP Code <br /> 2358 Waterloo Rd Stockton 95205 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> . ...... ........... .... <br /> Name of UST Service Technician Performing the Inspection(Print as shown on the ICC Certification.) Phone# <br /> Chris Adams (209) 461-6337 <br /> Contractor i Tank Tester License# ICC Certification# ICC Certification Expiration Date <br /> 8230218 <br /> 1001331 A-HAZ 6/19/2021 <br /> Overfill Prevention Equipment Inspection Training and Certifications(List applicable certifications.) <br /> OPW 109305 Exp 5/23/2021 <br /> III. OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION'_ <br /> Inspection Method Manufacturer Guidelines(Specify): <br /> Used: <br /> ❑Industry Code or Engineering Standard(Specify): <br /> ❑Engineered Method(Specify): <br /> Attach the inspection procedures and all documentation required to determine the results. #of Attached Pages <br /> TANK ID: (By tank number,stored product,etc.) 87 <br /> What is the tank inside diameter?(inches) 96" <br /> Is the fill piping secondarily contained? Z Yes ❑ No ❑Yes ❑No ❑Yes ❑No <br /> ID Yes ❑No <br /> Is the vent piping secondarily contained? Z Yes ❑ No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> Overfill Prevention Equipment Manufacturer(s) <br /> What is the overfill prevention equipment response ❑x Shuts Off Flow ❑Shuts Off Flow ❑Shuts Off Flow ❑Shuts Off Flow <br /> when activated? <br /> ❑ Restricts Flow ❑Restricts Flow El Restricts Flow ❑ Restricts Flow <br /> (Check aIl that apply.) <br /> ❑A1V Alarm ❑AIV Alarm ❑AIV Alarm ❑AN Alarm <br /> Are flow restrictors installed on vent piping? ❑Yes Z No ❑Yes ❑ No ❑Yes ❑No ❑Yes ❑No <br /> At what level in the tank is the overfill prevention set <br /> to activate?(Inches from bottom of tank.) <br /> What is the percent capacity of the tank at which the <br /> overfill prevention equipment activates? 93% <br /> Is the overfill prevention in proper operating condition ❑x Yes es ❑Yes El Yes <br /> to respond when the substance reaches the <br /> appropriate level? ❑No(Specify in V. ❑No(Specify in V.) ❑No(Specify in V.) ❑No(Specify in V) <br /> I.Y. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results ❑ Pass ❑Fail ❑ Pass ❑ Fail ❑Pass ❑f=ail 11 ❑ Pass ❑ Fail <br /> V. COMMENTS <br /> Any items marked Fail"must be explained in this section. Any additional comments may also be provided here. <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING'THIS INSPECTION. <br /> I hereby certify thatthe overfill prevention equipmentwas inspected in accordance with California Code of Regulations,Title 23, <br /> Division 3,Chapter 16,Section 2637.2 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> If the facility has more components than this form accommodates,additional copies of this page may be attached. <br /> CERS=Carifomia Environmental Reporting System,ID=Identification,UST=Underground Storage Tank,ICC=International Code Council,AN=Audible and Visual <br />