My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
192
>
2300 - Underground Storage Tank Program
>
PR0505867
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2024 11:48:47 AM
Creation date
2/16/2021 2:01:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0505867
PE
2361 - UST FACILITY
FACILITY_ID
FA0007059
FACILITY_NAME
H&S Energy Products, LLC #3035
STREET_NUMBER
192
STREET_NAME
LATHROP
STREET_TYPE
RD
City
Lathrop
Zip
95330
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
192 Lathrop RD Lathrop 95330
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by © Manufacturer Q Industry Standard El Professional Engineer <br /> Test Type © Pressure Q Vacuum E Hydrostatic <br /> Test Equipment Used: INCON STS <br /> Sump/UDC ID 87 STP E-85 STP UDC 3-4 UDC 7-8 <br /> Sump Manufacturer Unknown Unknown Bravo Bravo <br /> Sump Depth (inches) 56 56 24 24 <br /> Sump Bottom to Top of 12 42 16 16 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 12:42 14:09 14:57 14:57 <br /> Initial Reading 2.8141 2.8421 2.1164 3.3209 <br /> Test End Time 12:57 14:24 15:12 15:12 <br /> Final Reading 2.8140 2.8421 2.1159 3.3208 <br /> Change in Reading 0.0001 0.0000 0.0005 0.0001 <br /> Pass/Fail Criteria +/- 0.002 +/- 0.002 +/- 0.002 +/- 0.002 <br /> Tightness Test Results Ej Pass rl Fail Ej Pass r] Fail © Pass © Fail 0 Pass EFail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results R7 Pass 0 Fail 0 Pass EJ Fail FEI Pass [rj Fail M Pass Ll Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.