Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by © Manufacturer Q Industry Standard El Professional Engineer <br /> Test Type © Pressure Q Vacuum E Hydrostatic <br /> Test Equipment Used: INCON STS <br /> Sump/UDC ID 87 STP E-85 STP UDC 1-2 UDC 5-6 <br /> Sump Manufacturer Unknown Unknown Bravo Bravo <br /> Sump Depth (inches) 56 56 24 24 <br /> Sump Bottom to Top of 12 42 16 16 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:12 09:50 12:05 12:28 <br /> Initial Reading 1.9331 4.3388 5.3621 5.2438 <br /> Test End Time 10:27 10:05 12:20 12:43 <br /> Final Reading 1.9323 4.3395 5.3637 5.2438 <br /> Change in Reading 0.0008 0.0007 0.0016 0.0010 <br /> Pass/Fail Criteria +/- 0.002 +/- 0.002 +/- 0.002 +/- 0.002 <br /> Tightness Test Results Ej Pass rl Fail El Pass rj Fail © Pass © Fail n Pass EFail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results R7 Pass 0 Fail 0 Pass El Fail 0 Pass [rl Fail M Pass Ll Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3of5 <br />