My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0083212_SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LEARNED
>
2387
>
2600 - Land Use Program
>
SR0083212_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 2:19:06 PM
Creation date
2/17/2021 1:58:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0083212
PE
2602
STREET_NUMBER
2387
Direction
E
STREET_NAME
LEARNED
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
17302010
ENTERED_DATE
1/28/2021 12:00:00 AM
SITE_LOCATION
2387 E LEARNED AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eastern San Joaquin Groundwater Basin Groundwater Management Plan <br />Northeastern San Joaquin County Section 8 <br />Groundwater Banking Authority 122 Integrated Conjunctive Use Program <br /> <br />Figure 8-11 Schematic Diagram of the MORE Model <br /> <br />Table 8-4 MORE WATER Project Preliminary Average Annual Yield and Cost Analysis Results <br />Duck Creek Dam and Reservoir Construction <br />Camanche Reservoir <br />Diversion Pardee Reservoir Diversion <br /> <br />Lower <br />Mokelumne <br />River <br />Diversion - <br />Structural <br />No <br />Hydropower <br />Impacts <br />Hydropower <br />Impacts <br />No <br />Hydropower <br />Impacts <br />Hydropower <br />Impacts <br />Annual Project <br />Yield (af) 49,200 82,300 90,300 82,300 90,300 <br />Annual Cost <br />($ per af) $150 $213 $196 $156 $147 <br />Source: MORE WATER Project Phase I - Reconnaissance Study Summary Report, 2004 <br />8.2.3 New Melones Conveyance Project <br />The New Melones Conveyance Project was constructed in order to deliver contractual CVP <br />entitlements to CSJWCD and SEWD from New Melones Reservoir on the Stanislaus River. <br />Water is diverted through the Goodwin Tunnel and conveyed through the Upper Farmington <br />Canal and a series of natural creeks to the Farmington Flood Control Reservoir. The Lower <br />Farmington Canal conveys water from the Farmington Flood Control Reservoir to its terminus <br />Pardee <br />Diversion <br />Diversion to <br />Storage <br />Camanche <br />Diversion <br />Duck Creek <br />ReservoirDirect <br />Diversion <br />County <br />Demand <br /> <br />CAMANCHE RELEASE: <br />• In-stream Flow Requirements <br />• Flood Control Releases <br />• Diversions and Losses <br />Mokelumne Hill <br />Gage <br />Pardee <br />Reservoir <br />Camanche <br />Reservoir <br />Lower <br />Mokelumne <br />Diversion <br /> <br />STREAM FLOW <br />Bay Delta <br />Mokelumne <br />Aqueducts <br />EBMUD <br />Terminal <br />Reservoirs <br />EBMUD’s <br />Customer <br />Demand <br />Area of <br />Beneficial Use <br />
The URL can be used to link to this page
Your browser does not support the video tag.