t d
<br /> 05/23/2002 13: 21 5414596782 ORENCO SYSTEMS PAAGE132/02
<br /> J
<br /> AdvanTex° Treatment .System
<br /> Cost EstimatingoCrefteo a nme ..
<br /> Wo rks h e et lncorparated
<br /> 1-500-348.9843 . .•
<br /> Application System Data
<br /> This cost estimating worksheet.5hould be used for System Dcsisn'Flows($pd)
<br /> preliminary cost estimating only. D6P,to variances Loading Rate(gal/sq.RJday) 47
<br /> Products specified,recirculation tat:k.costs;as well as labor Number of AdvauTex 24 Pods: 2
<br /> and engineering costs,a low and high rang,,esiimrte is Recirculating Tank Capacity(g4vns) 3 000 .
<br /> Provided, Number of Pumping Packages 1
<br /> Number ofAutomstic Distributing Vaj�es - 0
<br /> Number of Recirculating splitter valves 1
<br /> - Number of Ventilation Fan Assemblies
<br /> Project: ' . . °
<br /> U it Cnst Ras a ToYal'+CosRaii
<br />' Low Hi h Low Xe h.
<br /> Materials.
<br /> RecnrculAtlon Tsak •
<br /> r Delivej ed to site d , t ? • Q
<br /> $2,700 $3,600
<br /> Taok Access Equipnwit
<br /> Risers,lid,adapters,grommets,epoxy $225 $340 $4S0 $600
<br /> PuuipingEgn�ipment-
<br /> Pump vault,pumps,h&v,splice box,.float assembly $1,500 S1,8
<br /> 00 $1,S4Q
<br /> $.1,RD0
<br /> Control Panel
<br /> Control panel(with Telemetry) , $1,440 $1.600 J. $1,400 $1,604
<br /> Automatic Distnbutfng Valve
<br /> Distributing valve,caclosure,iid $325 $400 $0 $0
<br /> 741see11aneous Equiptuent
<br /> Piping,fittings,glue $50 $75 $140 $]SO
<br /> Aocircusating Splitter valve
<br /> RSV,mounting bracket $340 '$400" . 5344 $400 '
<br />{ ventilation 1?9sa Assembly
<br /> Ventilation'fan,enclosure,sir vent $1,145. $1,325. SO $p
<br /> .Advan 1`ex l.cfuipurant
<br /> AdvanTex Filter $2,138 $z,3§0.. $4,276 $4,760
<br /> Materials Subtotal s11o,766 siyssD
<br /> Labor and En ineelren
<br /> -Labor and M9sc-V4ulpment
<br /> Percent of Materials 40% 100% $4;306
<br /> iy $12,$30
<br /> Engidirering,Permits,Inspection
<br /> Percent of Materials - 20% 25°10 $2,153 $3,213
<br /> 10perstion and Mstintenanae Manual
<br /> Two copies of project-specific 0&M Manua $340 $app 1300 $304
<br /> Labor and En[;lneering Subtotal 'S6,76o $16,363
<br /> 41. I . .I . . ':. .I
<br /> Tbtal Installed Costs of Comlete System
<br /> = Cost per Treated,Gallon 59.35 $f5-ss .
<br /> *Cost estimate does not include materials and labor cysts for collection,pretrealment,or dispersal.
<br /> - Rcv.rl,1b-07/02. -
<br /> '� 111 YYY i,_�. ,2J�,- .� ,�`•¢��'.� t 1 3.��,, E i .t 3 '/ j7 1. '. f .�.S f;.
<br />
|