Laserfiche WebLink
t d <br /> 05/23/2002 13: 21 5414596782 ORENCO SYSTEMS PAAGE132/02 <br /> J <br /> AdvanTex° Treatment .System <br /> Cost EstimatingoCrefteo a nme .. <br /> Wo rks h e et lncorparated <br /> 1-500-348.9843 . .• <br /> Application System Data <br /> This cost estimating worksheet.5hould be used for System Dcsisn'Flows($pd) <br /> preliminary cost estimating only. D6P,to variances Loading Rate(gal/sq.RJday) 47 <br /> Products specified,recirculation tat:k.costs;as well as labor Number of AdvauTex 24 Pods: 2 <br /> and engineering costs,a low and high rang,,esiimrte is Recirculating Tank Capacity(g4vns) 3 000 . <br /> Provided, Number of Pumping Packages 1 <br /> Number ofAutomstic Distributing Vaj�es - 0 <br /> Number of Recirculating splitter valves 1 <br /> - Number of Ventilation Fan Assemblies <br /> Project: ' . . ° <br /> U it Cnst Ras a ToYal'+CosRaii <br />' Low Hi h Low Xe h. <br /> Materials. <br /> RecnrculAtlon Tsak • <br /> r Delivej ed to site d , t ? • Q <br /> $2,700 $3,600 <br /> Taok Access Equipnwit <br /> Risers,lid,adapters,grommets,epoxy $225 $340 $4S0 $600 <br /> PuuipingEgn�ipment- <br /> Pump vault,pumps,h&v,splice box,.float assembly $1,500 S1,8 <br /> 00 $1,S4Q <br /> $.1,RD0 <br /> Control Panel <br /> Control panel(with Telemetry) , $1,440 $1.600 J. $1,400 $1,604 <br /> Automatic Distnbutfng Valve <br /> Distributing valve,caclosure,iid $325 $400 $0 $0 <br /> 741see11aneous Equiptuent <br /> Piping,fittings,glue $50 $75 $140 $]SO <br /> Aocircusating Splitter valve <br /> RSV,mounting bracket $340 '$400" . 5344 $400 ' <br />{ ventilation 1?9sa Assembly <br /> Ventilation'fan,enclosure,sir vent $1,145. $1,325. SO $p <br /> .Advan 1`ex l.cfuipurant <br /> AdvanTex Filter $2,138 $z,3§0.. $4,276 $4,760 <br /> Materials Subtotal s11o,766 siyssD <br /> Labor and En ineelren <br /> -Labor and M9sc-V4ulpment <br /> Percent of Materials 40% 100% $4;306 <br /> iy $12,$30 <br /> Engidirering,Permits,Inspection <br /> Percent of Materials - 20% 25°10 $2,153 $3,213 <br /> 10perstion and Mstintenanae Manual <br /> Two copies of project-specific 0&M Manua $340 $app 1300 $304 <br /> Labor and En[;lneering Subtotal 'S6,76o $16,363 <br /> 41. I . .I . . ':. .I <br /> Tbtal Installed Costs of Comlete System <br /> = Cost per Treated,Gallon 59.35 $f5-ss . <br /> *Cost estimate does not include materials and labor cysts for collection,pretrealment,or dispersal. <br /> - Rcv.rl,1b-07/02. - <br /> '� 111 YYY i,_�. ,2J�,- .� ,�`•¢��'.� t 1 3.��,, E i .t 3 '/ j7 1. '. f .�.S f;. <br />