My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0033424_ENG DESIGNED PLAN
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
10948
>
4200 – Liquid Waste Program
>
SR0033424_ENG DESIGNED PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 5:01:01 PM
Creation date
2/17/2021 4:48:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
ENG DESIGNED PLAN
RECORD_ID
SR0033424
PE
4202
STREET_NUMBER
10948
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WY
City
MANTECA
Zip
95336
ENTERED_DATE
4/9/2003 12:00:00 AM
SITE_LOCATION
10948 S AIRPORT WY
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOFLOW, INC *, http://www.geoll .com/wastewater/Operations%20a... <br /> 5. SUPPLY MANIFOLD <br /> This carries the water from the dosing tank to the dispersal area. Rigid PVC is <br /> usually used and must be designed to slope back to the pump tank in freezing <br /> conditions. The velocity in the manifold should be between 2 feet per second and 5 <br /> feet per second (fps). Refer to PVC pipe sizing chart in the appendix to determine <br /> the best diameter for your application. <br /> 5. RETURN MANIFOLD <br /> In order to help clean the system, the ends of the drip lines are connected together <br /> into a common return line, most often made of rigid PVC. This line will help <br /> equalize pressures in the system. Flushing should be done frequently during the <br /> installation period. Periodic flushing under full system pressure will guarantee a <br /> long system life. The return manifold should be installed to drain the line back to <br /> the pretreatment tank in freezing climates. <br /> 7. PRESSURE REGULATOR <br /> Pressure regulators fix the inlet pressure at a given rate and are.recommended with <br /> ` WASTEFLOW Classic. Under normal operating conditions, pressure in the drip <br /> lines should be: <br /> 10 psi to 45 psi for WASTEFLOW Classic and <br /> 7 psi to 60 psi for WASTEFLOW PC <br /> 8, 'AIR VACUUM BREAKER <br /> Au vacuum breakers are installed at the high points to keep soil from being sucked into the <br /> emitters due to back siphoning or backpressure. This is an absolute necessity with underground <br /> drip systems. They are also used for proper draining of the supply and return manifolds in <br /> freezing conditions. Use one on the high end of the supply manifold and one on the high point of <br /> the return manifold. Additional. air vDts may be required depending on terrain Maximum flow <br /> per vacuum breaker is 50 gpm. Freezing conditions require the air vacuum breaker be protected <br /> !+ with insulation. <br /> Air Vacuum Specification <br /> The air vacuum relief valve provides instant and continuous vacuum relief and non-continuous air relief. <br /> Both the body and the removable dirt cover shall be constructed of molded plastic. The body and the dirt <br /> cover shall be connected with a 3/4 inch hose thread. The ball shall be constructed of lov density <br /> plastic and the internal seat shall he constructed of vinyl The air vacuum relief valve shall seal at 5 <br /> psi. Inlet size shall be a 1-inch male pipe thread. The air vent shall be Geoiozv item number <br /> A.PVBK 1 <br /> 1 <br /> 3 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.