Laserfiche WebLink
CalEEMod Version: CalEEMod.2016.3.2 Page 2 of 87 Date: 8/14/2020 4:11 PM <br /> River Islands Phase 2 Construction Emissions (2003 SEIR Land Uses)- San Joaquin County, Annual <br /> Project Characteristics - 95330 Zip Code; CO2 Intensity Factor amended for 2018 based on PG&E 10-k form. This model runs for construction emissions only. <br /> Land Use- Land uses derived from Chapter 2. Project Description. Land uses adjusted by one fifth total. <br /> Construction Phase - Construction to commence spring 2021 and end fall 2040. CaIEEMod Default ratios utilized to provide phasing estimates. <br /> Off-road Equipment- CalEEMod defaults used <br /> Trips and VMT- Grade crew: 50 workers, underground crew: 8 workers, finish grade crew: 10 workers, homebuilder crew: 140 workers. <br /> Demolition - General estimate of tons to be demolished. <br /> Grading - No import or export of materials. <br /> Architectural Coating -This model runs for GHG emissions only. <br /> Vehicle Trips - <br /> Energy Use - <br /> Water And Wastewater- <br /> Solid Waste- <br /> Construction Off-road Equipment Mitigation - <br /> Off-road Equipment- CalEEMod defaults used. <br /> Table Name Column Name Default Value New Value <br /> tblConstDustMitigation WaterUnpaved RoadVehicleSpeed 0 15 <br /> tblConstruction Phase NumDays i 155,000.00 3,782.00 <br /> tblConstruction Phase NumDays } 10,000.00 244.00 <br /> -----------------------------Y------------------------------r------------------------------------------------------- <br /> tblConstruction Phase NumDays } 6,000.00 146.00 <br /> -----------------------------Y------------------------------r------------------------------------------------------- <br /> tblConstruction Phase NumDays } 15,500.00 378.00 <br /> -----------------------------Y------------------------------r------------------------------------------------------- <br /> tblConstruction Phase NumDays } 11,000.00 268.00 <br /> -----------------------------Y------------------------------r------------------------------------------------------- <br /> tblConstruction Phase NumDays } 11,000.00 268.00 <br /> -----------------------------Y------------------------------r------------------------------------------------------- <br /> tblLandUse Land UseSquareFeet } 240,000.00 613,325.00 <br /> -----------------------------Y------------------------------r------------------------------------------------------- <br /> tblLandUse Land UseSquareFeet } 120,000.00 304,049.00 <br /> --------------------------- ----------------------------- ------------------------------ ------------------------ <br /> tblLandUse Land UseSquareFeet 1,769,400.00 12,948,646.00 <br />