Laserfiche WebLink
CalEEMod Version: CalEEMod.2016.3.2 Page 20 of 87 Date: 8/14/2020 4:11 PM <br /> River Islands Phase 2 Construction Emissions (2003 SEIR Land Uses)- San Joaquin County, Annual <br /> Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor <br /> Building Construction 'Cranes ; 1; 7.001 231, 0.29 <br /> + i <br /> i <br /> Building Construction +Forklifts ; 31 8.001 89, 0.20 <br /> + _ __ i __ <br /> i <br /> Building Construction 'Generator Sets ; 11 8.001 84, 0.74 <br /> --------------------------- ------------------------- ------------------------------- ------------ -------------- ----------- <br /> _ i <br /> Building Construction +Tractors/Loaders/Backhoes ; 31 7.001 97, 0.37 <br /> --------------------------- �- - - - - ------------ ------------- ----------- <br /> Building Construction 'Welders ; 11 8.001 46, 0.45 <br /> ---------------------------- ------------------------- ------------------------------ ------------ -------------- ----------- <br /> Architectural Coating 'Air Compressors ; 11 6.001 78, 0.48 <br /> + i <br /> --------------------------- - - - - ------------ ------------- <br /> i <br /> Demolition +Concrete/Industrial Saws ; 1 1 8.001 81, 0.73 <br /> ---------------------------- ------------------------- ------------------------------- ------------ -------------- ----------- <br /> _ i <br /> Demolition +Excavators ; 31 8.001 158: 0.38 <br /> -------------------------- ------------ ------------- ----------- <br /> �_ <br /> i <br /> Grading +Excavators ; 21 8.001 158, 0.38 <br /> -------------------------- �- - - - - ------------ ------------- ----------- <br /> Grading 'Graders ; 11 8.001 187, 0.41 <br /> -------------------------- �- - - - - ------------ ------------- ----------- <br /> Paving +Pavers ; 21 8.001 130, 0.42 <br /> + _ __ i i __ <br /> Paving +Paving Equipment ; 21 8.001 132, 0.36 <br /> a <br /> -------------------------- ------------ ------------- ----------- <br /> i <br /> Paving +Rollers ; 21 8.001 80, 0.38 <br /> a __ i __ <br /> Demolition 'Rubber Tired Dozers ; 21 8.001 247, 0.40 <br /> �- - - - ------------ ------------- ----------- <br /> i <br /> Grading 'Rubber Tired Dozers ; 11 8.001 247, 0.40 <br /> --------------------------- �- - - - - ------------ ------------- ----------- <br /> Site Preparation 'Rubber Tired Dozers ; 31 8.001 247, 0.40 <br /> �- - - - - ------------ ------------- ----------- <br /> i <br /> Grading 'Scrapers ; 21 8.001 367, 0.48 <br /> --------------------------- �- - - - - ------------ ------------- ----------- <br /> Grading +Tractors/Loaders/Backhoes ; 21 8.001 97, 0.37 <br /> ---------------------------- --------------------------*-----------------I•------------r------------- ----------- <br /> Site Preparation •Tractors/Loaders/Backhoes 4. 8.00, 97, 0.37 <br /> Trips and VMT <br />