Laserfiche WebLink
Ah <br />Part 3. FACILITY INFORMATION <br />A. PROPOSED CHANGE (Check applicable box(es)): <br />I. DESIGN (describe): Add biomass gasifier; add C&D Processing Line; add aeration equipment for composting; <br />'increase design capacl y. <br />Increase daily tonnage to 1,800 TPD; expand C&D operations area; increase Inert Debris <br />processing area; increase hours for receipt of materials; increase hours for processing; <br />U2. OPERATION (describe): increase traffic volume. <br />03. OWNER, OPERATOR, ADDRESS, AND/OR FACILITY NAME CHANGE (describe): n/a <br />04. OTHER (describe): n/a <br />B. FACILITY INFORMATION: <br />1. INFORMATION APPLICABLE TO ALL FACILITIES: <br />a. PEAK DAILY TONNAGE OR CUBIC YARDS 1,800 TPD (MSW), 1,038 Tons per week (composting) <br />1) DISPOSAL/TRANSFER (unit) 1,800 TPD <br />2) OTHER (unit) n/a <br />b. DAILY DESIGN TONNAGE (TPD) TPD <br />c. FACILITY SIZE (acres) 51.7 <br />d. PEAK TRAFFIC VOLUME PER DAY (vpd) 1,245 VPD <br />Hours for Receipt of Materials: 24 hours/Monday-Sunday, Self haul, 6 AM to 6 PM/Monday- <br />Sunday. Processing hours: indoors - 24 hours/Monday-Sunday, Outdoors - 6 AM to 10 <br />e. DAYS AND HOURS OF OPERATION PM/Monday-Sunday. Maintenance Hours: 24 hours/Monday-Sunday. <br />2. ADDITIONAL INFO. REQUIRED FOR COMPOSTING FACILITIES ONLY: <br />a. SITE STORAGE CAPACITY (cu yds) 49,200 cu. yds. <br />3. ADDITIONAL INFORMATION REQUIRED FOR LANDFILLS ONLY: <br />a. AVERAGE DAILY TONNAGE (TPD) n/a <br />b. SITE CAPACITY CURRENTLY PERMITTED (Airspace) (cu yds) n/a <br />c. SITE CAPACITY PROPOSED (Airspace) (cu yds) n/a <br />d. SITE CAPACITY USED TO DATE (Airspace) (cu yds) n/a <br />e. SITE CAPACITY REMAINING (Airspace) (cu yds) n/a <br />I. DATE OF CAPACITY INFORMATION (Date) (See instructions): n/a <br />g. LAST PHYSICAL SITE SURVEY (Date) n/a <br />h. ESTIMATED CLOSURE DATE (month and year) n/a <br />i. DISPOSAL FOOTPRINT (acres) n/a <br />j. SITE CAPACITY PLANNED (cu yds) n/a <br />k. 1. (i) IN-PLACE WASTE DENSITY (Ibs of waste per cu yd of waste) n/a <br />AND <br />(ii) WASTE -TO -COVER RATIO (Estimated) (v:v) n/a <br />OR <br />2. AIRSPACE UTILIZATION FACTOR (tons of waste per cu yd of landfill airspace) n/a <br />Part 4. SOURCE OF WATER SUPPLY (Check applicable boxes) <br />MA. MUNICIPAL OR UTILITY SERVICE: <br />FEB. INDIVIDUAL (wens): All water for facility operations, including potable water will be obtained from an on site <br />supply well. <br />❑C. SURFACE SUPPLY: <br />1. NAME OF STREAM, LAKE, ETC.: <br />2. TYPE OF WATER RIGHTS: <br />®RIPARIAN ❑ APPROPRIATION <br />3. STATE PERMIT OR LICENSE NUMBER, IF APPLICABLE: <br />Page 2 <br />