Laserfiche WebLink
VR-202-Z -24 Exhibit 2 <br /> Figure 2-913 <br /> Typical Configuration of Piping Layout for ARID Permeator Dual Inlet <br /> with Single Return on 3 UST Station <br /> PERM EATOR AT-150 <br /> (MOUNTED ON CONCRETE PAD) <br /> INLET(FEED) <br /> FROM MANIFOLD OF TWO TANKS <br /> TO PERMEATOR AT-150 INLET <br /> (MIDDLE AND RIGHT TANKS) <br /> RETURN(RETENTATE) <br /> FROM PERMEATOR AT-1 50 <br /> TO REGULAR TANK <br /> (LEFT TANK) DUAL INLET OPTION <br /> TO EASE INSTALLATION,VENT STACK <br /> MANIFOLD CAN BE DONE EITHER WAY. <br /> (ONE METHOD MIGHT BE EASIER DEPENDING <br /> ON PERMEATOR AT-150 ORIENTATION ON <br /> CONCRETE MOUNTING SLAB) <br /> DUAL INLET INSTALLATION <br /> PIPING DISTANCE FROM MIDDLE TANK TO <br /> VENT RISER IS LESS THAN OR EQUAL TO 90 FEET <br /> OF MINIMUM 2INCH I.D.VAPOR PIPING MANIFOLD <br /> AT VENT STACK OF PREMIUM TANK(LEFT TANK) <br /> TO REGULARIPLUS(MIDDLE TANK) <br /> ALLOWS FOR PERMEATORAT-150 INSTALL. <br /> REGULAR REGULAR PREMIUM <br /> FUEL OR FUEL <br /> PLUS FUEL <br /> ��7VAPOR MANIFOLD CONNECTING <br /> ALL TANKS(3 INCH I.D.PIPING MIN.) <br />