Laserfiche WebLink
VR-202-Z -26 Exhibit 2 <br /> Figure 2-10B <br /> Typical Configuration of Piping Layout for ARID Permeator <br /> Single Vent Inlet (Manifold at UST) with Single Return on 3 UST Station <br /> PERMEATOR AT-150 <br /> (MOUNTED ON CONCRETE PAD) <br /> INLET(FEED) <br /> FROM VAPOR MANIFOLD TO <br /> PERMEATOR AT-150 INLET <br /> RETURN(RETENTATE)FROM <br /> PERMEATOR AT-150 TO <br /> REGULAR TANK(LEFT TANK) <br /> TO BE MINIMUM 2 INCH I.D. <br /> VAPOR PIPING <br /> NOTE:LINE NEEDS TO <br /> BE ADDED TO <br /> FACILITATE <br /> INSTALLATION <br /> SINGLE INLET INSTALLATION <br /> PIPING DISTANCE FROM TANK MANIFOLD <br /> TO VENT RISER IS LESS THAN <br /> OR EQUAL TO 90 FEET OF MINIMUM <br /> 3 INCH I.D.VAPOR PIPING. <br /> VAPOR MANIFOLD CONNECTING <br /> ALL TANKS(3 INCH I.D.PIPING MIN.) <br /> REGULAR REGULAR PREMIUM <br /> FUEL OR FUEL <br /> PLUS FUEL <br />